Permit Review Detail
Review Status: Stopped
Review Details: SITE
Permit Number - T01CM04434
Review Name: SITE
Review Status: Stopped
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/22/2002 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 04/26/2002 | JOE LINVILLE | NPPO | REVIEW | Denied | Native plant preservation plan not included in submittal. Plans will not be accepted for resubmittal without complete plans. |
| 04/26/2002 | JOE LINVILLE | LANDSCAPE | REVIEW | Denied | OK to submit required by the Landscape Section prior to re-submittal. Previous comments have not been addressed and submittal is incomplete. Must include previously submitted plans, native plant preservation plans and landscape plans. |
| 05/01/2002 | JIM TATE | SANITATION | REVIEW | Denied | See engineering comments. |
| 05/01/2002 | JIM TATE | ENGINEERING | REVIEW | Denied | The following items must be revised or added to the site plan. Please include a response letter with the next submittal that states how all the engineering, flood plain, and solid waste comments have been addressed. The Grading Plan was reviewed for Site Plan purposes only. 1. Please show water surface elevations for Mission View Wash . (DS2-02.2.1.15) 2. Please show the limits of the retention/detention basin on the plan. List the top elevation, bottom elevation, 100-yr WSEL, weir invert elevation. (Standards Manual for Drainage Design and Floodplain Management SMDDFM 2.3.1.6.A.4) 3. Please include side bollards on the waste container pad. (DS 2-02.2.1.32) 4. The drainage swale crosses the north road near the parking location. Please show the proposed drainage structure at the road. 5. The detention routing data is incorrect. The inflow quantities exceed the volumetric capacity of the basin (including the flow capacity of the weir). The basin will overflow its banks. Please review and revise the routing. 6. The proposed south and west roads are not within the property limits. The conditions for variance requires these roads to be built. Please provide agreements from the adjacent property holders for these roads to be developed. |
| 05/01/2002 | JIM TATE | FLOODPLAIN | REVIEW | Denied | See engineering comments. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/24/2002 | ELAINE ROSE | OUT TO CUSTOMER | Stop |