Permit Number: T01CM04185
Parcel: 118220430

Address:
1350 S 8TH AV

Review Status: Completed

Review Details: SITE

Permit Number - T01CM04185
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/22/2002 DAN CASTRO ZONING REVIEW Approved 1. Provide copy of recorded lot combination affidavit.
07/22/2002 DAN CASTRO HANDICAP-SITE REVIEW Approved
08/05/2002 JOE LINVILLE LANDSCAPE REVIEW Denied 2-07.2.0 LANDSCAPE PLAN CONTENT AND SPECIFICATIONS. The landscape plan serves as the document on which the intent to comply with the requirements of Sec. 3.7.0 of the LUC is noted. The landscape plan is kept on file and becomes part of the permanent record for the subject site. Any change in design or land use requires a new review and approval
process for the landscape plan. Certificates of Occupancy will not be issued, nor will the building be occupied, until the landscaping on the site meets the approved landscape plan
criteria. Provide revised landscape plan.

New elements on the site such as the parking addition are subject to LUC 3.7 as well as the refuse and recycling areas, the new screen walls, bike racks, and any other improvements proposed in landscape areas. In addition existing development on the site is subject to the requirements in effect at the time the site received zoning compliance approval. The new plan must also include required elements of the landscape plan dated 12/10/88.

Based upon cursory review of the site plan the following items should be considered when preparing the landscape plan. Parking area landscaping and screening, wall locations, dimensions of required landscape buffers, coverage requirements, specific use screening. Consult LUC 3.8 and DS 2-15.
08/05/2002 JOE LINVILLE NPPO REVIEW Denied Provide preservation plan or application for exception.
DS 2-15, LUC 3.7.
Plans will not be accepted for resubmittal without one of the items listed above. Approval to resubmit is required by the Landscape Section.
08/09/2002 JIM TATE ENGINEERING REVIEW Approved
08/09/2002 JIM TATE SANITATION REVIEW Denied Provide written approval from the Department of Solid Waste for the proposed solid waste pickup.
08/09/2002 JAMES TATE FLOODPLAIN REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/09/2002 MONICA VALDEZ OUT TO CUSTOMER Completed