Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T01CM04032
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/16/2001 | JAMES TATE | FLOODPLAIN | REVIEW | Approved | |
| 08/20/2001 | PATRICIA GEHLEN | ZONING | REVIEW | Approved | |
| 08/23/2001 | INGA DAVIDSON | WATER | REVIEW | Approv-Cond | |
| 08/27/2001 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 08/27/2001 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
| 08/30/2001 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 09/24/2001 | JIM EGAN | FIRE | REVIEW | Approved | |
| 09/24/2001 | JKOZUCH | BUILDING-COMMERCIAL | REVIEW | Denied | .....T01CM04032.....2420 N CAMPBELL AVE ....DGL...9/21/01 ...... 1. THE IBC REQUIRES FIRE RESISTANCE AT PROPERTY LINES . CLARIFY HOW THIS PROJECT AND THE BUILDING TO THE SOUTH WILL HAVE FIRE RESISTANCE RATINGS WHICH WILL BE MAINTAINED IN CONFORMANCE WITH THESE REQUIREMENTS. THE MOST RESTRICTIVE OF IBC, SEE IBC SEC 6, TABLE 602, CHAPTER 7 SEC 705, AND SEC 503.2. . .. ................................................................................... 2. RECEIVING AND WORK ROOM TOGETHER APPEAR TO BE 'S' OCCUPANCIES EXCEEDING 10% ACCESSORY USE ALLOWED BY IBC SEC 302.2. PROVIDE OCCUPANCY SEPARATION REQUIRED BY SEC 302. . . .................................... 3. CLARIFY DOOR ENCROACHMENT AT DOUBLE EXIT DOOS, DOOR OPENING TO EAST, SEE IBC SEC 1003.2.3.1, ALSO SEE SEC 1003.2.5, AND CHECK ENCROACHMENT AT MEN'S TOILET ROOM DOOR SWINGING OUT OF ROOM 105. .. . ......... 4. PROVIDE DOOR SCHEDULE AND HARDWARE SCHEDULE TO SHOW CONROMANCE WITH IBC SEC 1003.3.1.8 AND 1003.3.1.9 . . .. ................................................................................... 5. CLARIFY LANDING SIZE , LOCATION AND ELEVATIONS PER IBC SEC 1003.3.1.4, 1003.3.1.5, 1003.3.1.6 ON FLOOR PLAN DWG A4, SHOW FFE AND FINISHED GRADES. . . ........... 6. SHOW RAMP FULLY CONFORMS TO IBC SEC 1003.3.4. . . .... 7. SHOW AISLE WIDTHS CONFORM TO IBC SEC 1004.3, 44" MIN W/ DISPLAYS ON BOTH SIDES OF THE AISLE. . ................ 8. REF DWG T-1 MERCANTILE IS 'M' OCCUPANCY NOT 'B' OCCUPANCY NOTED ON T-1, REVISE T-1. . . . ........................... 9. FULLY DEFINE LIMITS OF PUBLIC- USE AREAS AND PRIVATE AREAS WITHIN THE BUILDING/S. . . . ........................ 10. CLARIFY PREMISES IDENTIFICATION PER IBC SEC 501.2. 11. PROVIDE ELEVATION DWG SHOWING ADDRESS CONFORMING TO REQUIREMENTS OF PIMA COUNTY ADDRESSING ORDINANCE, SEE ATTACHMENT. ;. . ................ 12. PROVIDE COMPLETED CODE REVIEW CHECKLIST, FILL OUT ITEMS 2a AND 2b. , . .............................................................. 13. SHOW WEATHER PROTECTION AT NEW EXTERIOR DOORS AND WINDOWS REF DWG A-8, IBC SEC 14,1401 - 1405. . . ............................................................................................... 14.INDICATE ROOF COVERING CLASSIFICATION PER IBC SEC 1505. . . ...................................................................................... 15. DETAIL ROOF FLASHING AND COUNTERFLASHING AND CAPS PER IBC CHAP 15, SEC 1507 AND SEC 1510. . ................. 16. PROVIDE SPECIFICATION FOR GLAZING, SAFETY GLAZING REQUIRED AT WINDOW ADJACENT TO NEW EXIT DOOR AT NORTH WALL OF BUILDING #1, REF DWG A-4 AND A-8, IBC SEC 2406. . . ............................................................ .......... 17. PROVIDE NEW WOOD FRAMING AND STUCCO WALL CROSS-SECTION DETAIL ON DWGS,SHOWING MATERIALS OF CONSTRUCTION ,CONNECTIONS TO STRUCTURE ABOVE AND BELOW W/FASTENER TYPE , SIZE SPACING/NUMBER, LATH ,STUCCO,TREATED BOTTOM PLATE,WEATHER RESISTIVE LAYER, AT NEW NORTH DOUBLE DOORS, REF DWG A-8,IBC CHAPTER 25. . .................. 18.NO MOP SINK IN WOMEN'S TOILET ROOM, PUT IN JANITOR'S CLOSET. . ..................................................................... 19. CLARIFY HOW WOMEN'S TOILET ROOM WILL BE ACCESSIBILE TO PUBLIC,MAINTAIN PATHOF TRAVEL, SEE IBC SEC 2902.6, IN PUBLIC AREA. . ............................................... 20. FULLY DIMENSION AND DETAIL ACCESSIBILE TOILETS ON FLOOR PLANS AND ELEVATIONS TO LOCATE FIXTURES, INCLUDING CROSS-SECTION THROUGH LAV'S SHOWING KNEE AND TOE SPACES, INSULATION OF PLUMBING LINES, SHOW REQUIRED CLEAR SPACES AT DOOR AND FIXTURES PER ICC/ANSI A117.1-1998, IBC CHAPTERS 11AND 34. . .................................................................. 21. PROVIDE A PUBLIC ACCESSIBILE DRINKING FOUNTAIN PER TABLE 2902.1. . . . .................................................................... 22. CLARIFY ACCESSIBILITY, IS BUILDING FULLY IN CONFORMANCE WITH IBC CHAPTER 11 AND 34? PROVIDE STATEMENT ON DRAWING T-1. . . ............................................... 23.CLARIFY HANDRAIL AT EACH SIDE OF RAMP AT |
| 09/24/2001 | JKOZUCH | BUILDING-COMMERCIAL | REVIEW | Denied | FOR REMAINDER OF COMMENTS 23--45, SEE HARD COPY ATTCHEED TO APPLICATION. |
| 09/26/2001 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/19/2001 | JKOZUCH | OUT TO CUSTOMER | Completed |