Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T01CM02515
Review Name: REVISION
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/23/2002 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | 1) The high phase on panel PA is 33.3 amps. In light of the fact A phase is 8 times larger than the other 2 phases it should be utilized to determine the panel load. 2) It is not clear where in the building this work takes place. Provide a location plan which includes the building floor plan and the location of the work within the building. 3) The design indicates #8 conductors paralleling between 2 disconnects and then both the receptacles and the AC originate from 1 of the 2 disconnects. Clarify your intent and provide a design consistent with the panel schedule. 4) Provide revised circuitry plans showing the changes in the circuit numbers for the loads moved from panel PA to panel P. 5) The ** below panel P indicates a 40 amp circuit breaker should be used. A 50 amp breaker is required and is installed to serve panel PA. Please correct. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/31/2002 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |