| 04/25/2001 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 04/25/2001 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Approved | |
| 04/26/2001 | JIM EGAN | FIRE | REVIEW | Approved | |
| 04/30/2001 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. Minimum waste line size for a floor sink is 2" for this use. M-201 2. Provide a cleanout per Sec707.0 UPC1994 Az. Code on the new sink. |
| 04/30/2001 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Show on the plan how the mech. design complies with Chapter 4 IMC 2000. 2. Indicate on the plan what the exhaust fan and fume hood are classified as and show on the plan how the design complies with Chapter 5 IMC 2000. 3. Provide the tonage and amount of rifrigerant the chiller requires on the plan. 4. Provide the manufactures name and listing for the chilled water tank on the plan. NOTE: Tank shall comply with ASME Rules. |
| 05/02/2001 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | E-015 1) It appears the circuit breaker serving AH-3- 34,46,38 should be reduced to 90 amps. Page E-80 indicates the feeder serving the transformer is a #4 copper. 99NEC 310-16 75C column. 2) Circuit AH-3-28,30,32 appears in the panel and is part of phase 2 however it does not appear to be on the plan. 3) The panel loads for AL-3 appear to be incorrect. E-080 1) The one-line indicates panel AL-3 is served with 4# 1/0 1#6 ground. However page #-300 indicates panel AL-3 is served with 4# 2/0, 1# 4 ground. See column E.5, 6.5 on page E-300. 2) The disconnect size shown on the one-line serving panel AL-3 is not consistent with page E-300. Column E.5, 6.5 3) The 70-amp fuse serving panel AL-3 appears to be incorrect. Phase B is loaded to approximately 85 amps. 4) Provide a grounding electrode system for the 45kVA transformer. A minimum #6 copper conductor is required. 99NEC 250-30 5) Provide the lateral size from the utility transformer to the utility pull box serving panels AH-1 and 2. E-300 1) The transformer appears to be located in a doorway. If it is your intention to suspend the transformer provide a design and structural calculations. Column E, 6.5. 2) The panel prefix serving circuits AH-3-15,17,19-21 appears to be incorrect. The appropriate panel appears to be AL-3. In addition circuit AL-3-21 is utilized twice, once for the smoke detectors and once for general purpose receptacles. Column F.5, 6 3) Provide a disconnect for the door motor. Column F, 5. 99NEC 430-101 and 102. GENERAL COMMENTS 1) Return the plans I have already reviewed along with your next submission. They are easily recognizable as they are highlighted in yellow marker. |
| 05/04/2001 | TGRIFFUS | WWM | REVIEW | Passed | |
| 05/04/2001 | TGRIFFUS | BUILDING-COMMERCIAL | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/04/2001 | TAMI ACHONG | OUT TO CUSTOMER | Completed |