Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T01CM01468
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/25/2001 | JIM EGAN | FIRE | REVIEW | Approv-Cond | SEPARATE PERMITS AND SUBMITTALS REQUIRED FOR INSTALLATION OF ABOVEGROUND STORAGE TANKS, PRODUCT PIPING AND DISPENSERS. |
05/15/2001 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. Provide the Rim Elev. of M.H. #9723-03 on sheet SS2. 2. Where does the 4" HCS at Sta. 10+22.71 go to? 3. Provide a detail of the access required for the backwater valve on the plan. 4. Where does the 4" DIP HCS at Sta. 5+43.10 go to? 5 Venting does not comply with Sec 904.1 UPC 1994. 6. Provide the manufactures name and listing for all of the plumbing fixtures on the plan. 7. What is ICW on the plumbing plan P1.01? Provide a trap primer on all of the floor drains and floor sinks per Sec 1007.0 UPC 1994. Why are you using a 3" disc meter on a 2" line? |
05/15/2001 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Model Energy Code calculations are incorrect. Model Energy Code Calculations are to be based on the Civano Code. NOTE: Wall areas are not the same ie; N&S , E&W. Architectural drawings do not reflect calculations. 2. Evaporative Cooler does not comply with Sec 317.6 #2 UMC1994. 3. Provide access to the mechanical equipment on the roof per Sec 321UMC1994. 4. Bathroom exhaust does not comply with Sec 609.10 #3 UMC1994. |
05/16/2001 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | E1.01 1) It appears the #8 equipment ground for the streetlights should be increased to a #6. 99NEC250-122 E2.00 1) Please provide the light fixture cuts for B and S fixtures. E3.00 1) Please include a note to "Provide poured seal offs at both ends of all conduits entering, leaving, or passing through a classified area." 2) Provide poured conduit seals for keynote 11. 99NEC501-5 FPN 3) Provide fuse protection for cooler pump per C.O.T. amendments. E4.00 1) Provide poured seals for all keynote 1 conduits. 99NEC501-5 FPN E6.00 1) Provide sealed structural calculations for the light pole foundation detail 1. 2) The conduit depth in detail 1 must be 24" to top of conduit. 99NEC300-5 E8.00 1) Technically the equipment ground in keynote 3 should be a grounded (neutral conductor) per 99NEC250-24(b). 2) Provide a grounding electrode system for the Street Lighting Cabinet per 99NEC 250-24. 3) Please clarify whether the transfer switch is a 3 pole or 4 pole. Please note if the transfer switch is 4 pole a grounding electrode system is required at the generator. 99NEC250-30, 700-8(b). 4) The conduits from the PMH-9 cabinet to the future CNG facility are shown as (2) 4" on E1.01 and (2) 5" on E8.00. 5) Remove the ground wire in the secondary feeder to the SES. It is unnecessary and puts the neutral and ground in parallel. 99NEC250-30(a)(1) ex1, 250-32(b)(1) {in principal}, 310-4, 347-4 ex2. 6) The bonding jumper in the secondary feeder from TF to FP1 is required to be a #2 minimum. 99NEC250-30 7) Provide signage for the generator location at the service per NEC700-8(a). E9.00 1) The shunt trip breaker for panel FP2 must disconnect the neutral serving the panel. 99NEC514-5(c). 2) Provide a circuit breaker that is lockable in the off (open) position for circuit FP1-29,31. 99NEC422-31(b). 3) It appears the 1" conduit serving MP1 described in the panel schedule of FP2 is too small. 4) The description of transformer TF does not appear to match page E8.00 one line service diagram. General Comments 1) Provide MEC light budget calculations. 2) Though not a code issue it appears your intent is to provide a double ended loop primary feeder serving the Fueling, Maintenance, Central Plant, and Day Care buildings. Pages E1.00 and 1.02 appear to indicate a single lateral from the manhole to the Day Care Building. |
05/21/2001 | PHIL SEADER | BUILDING-COMMERCIAL | REVIEW | Denied | |
05/23/2001 | GERRY KOZIOL | WWM | REVIEW | Denied | |
05/24/2001 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Denied | |
05/24/2001 | WATER | WATER | REVIEW | Approved | |
05/31/2001 | JKOZUCH | ZONING | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/31/2001 | MONICA VALDEZ | OUT TO CUSTOMER | Completed |