Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T01CM01233
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/02/2002 | DOUG WILLIAMS | ENGINEERING | REVIEW | Approved | |
| 01/02/2002 | DOUG WILLIAMS | SANITATION | REVIEW | Approved | |
| 01/02/2002 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Approved | |
| 12/21/2001 | DAN CASTRO | ZONING | REVIEW | Approved | |
| 12/24/2001 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | Previous comments 6,9,&10 have not been addressed successfully. Please correct plans as requested in the previous comments and as indicated below. Provide a response letter. Previous comment#6 regarding screening for vehicular use area along Escalante has not been addressed. Previous comment #9 regarding HDZ revegetation and vegetation preservation has not been addressed. Previous comment#10 regarding Native Plant Preservation requirements has not been addressed. The retention basin landscape tree requirement requires that the trees be located within the basin area. DS 10-01.0 Locate trees within the basin. Consistently label and dimension all "natural bufferyards" referred to in Landscape Note 3 on Sheet L-1. Along the south property line, the landscape buffer and screening requirements are not met due to the extent of grading. Provide a minimum 10' interior landscape border and a minimum 5' high screen along the south property line adjacent to development. LUC Table 3.7.2-I |
| 12/25/2001 | JOE LINVILLE | NPPO | REVIEW | Approved | The requested Native Plant Preservation Plan has not been received. Please submit a Native Plant Preseration Plan. LUC 3.8, DS 2-15. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/02/2002 | TAMI ACHONG | OUT TO CUSTOMER | Completed |