Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T01CM00658
Parcel: 13112045C

Address:
5921 E 32ND ST

Review Status: Completed

Review Details: RESIDENTIAL BLDG/ZONING/FLOOD/WWM

Permit Number - T01CM00658
Review Name: RESIDENTIAL BLDG/ZONING/FLOOD/WWM
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/09/2001 PATRICIA GEHLEN ZONING REVIEW Approved
02/09/2001 PATRICIA GEHLEN NPPO REVIEW Passed
02/09/2001 TOM WEIDEMAN FLOODPLAIN REVIEW Approved
03/07/2001 JESUS MANUEL BUILDING-RESIDENTIAL REVIEW Approved 2000 IRC RESIDENTIAL CHECKLIST (4/19/00)





Date: March 7, 2001

To: Todd Strommen
5921 E. 32nd
Project No. T01CM00658

Structure Area S.F. Occ. Load Construction. Sprinklers Alarm
Residence (R-3) 576
Garage (U-1) 316
Porches/Patios

Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. In order to facilitate a shorter backcheck time, we request that you please provide revised plans and calculations, highlighting any changes, along with a written response to each of the noted items indicating the action taken.

SCOPE OF REVIEW:

The scope of this review covers Architectural, Structural, Plumbing, Mechanical, Model Energy and Electrical codes. All code references are to the 2000 IRC. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval.

GENERAL REQUIREMENTS:

1. All slabs and pads, including landings at all doors, shall be shown and their thickness specified. Indicate the slopes for exterior slabs, per R312.

2. Locate and specify all anchor bolt spacing and post anchors on the foundation plan.

3. All foundation hold downs and anchor bolt spacing for shear walls shall be specified and located.

FLOOR PLAN

1. Comply with R309.2. Provide ½"gypsum board on all walls common to the garage and house. Where the separation is a floor-ceiling assembly, the structure supporting the separation shall also be protected by a minimum ½" gypsum board or equivalent. Note doors between the house and the garage shall be minimum 1-3/8" solid core, per R309.1.

2. Note that bath tub and shower enclosures shall be finished per P2710 with ceramic tile, or a listed enclosure, to a height of 72" above the drain per R702.4 and R307.2.

3. Note and specify that shower enclosures shall have a minimum finished interior of 900 s.i., and shall be capable of encompassing a minimum 30" circle per P2708.1. All glass enclosures shall be tempered, per R308.4.

4. Show that each water closet is located in a clear space not less than 30" wide and has a clear space in front of not less than 24" per Figure R307.2.

5. Locate and identify shear wall types and locations. Provide nailing schedule.

6. Identify ceiling heights in all areas on floor plan.

7. Show locations of smoke detectors per R317. Note that all smoke detectors must be interconnected with a power source from the building wiring, and shall be equipped with battery backup.

STRUCTURAL PLANS:

1. Completely detail all connections and cross-reference to the foundation and framing plans:

- Hold down locations and type

2. Provide bracing details and notes for exterior frame walls and main cross-stud partitions, or use fully-braced, per R602.10.3. A minimum panel width of 48" is required to effectively brace the partition. See Table R602.10.3, Category "C". If bracing does not comply, provide a lateral analysis or alternate design to be reviewed by the plans examiner. Wind forces for single story residences shall use 90 mph, Exposure "B". Two story residences or areas of higher wind shall use Exposure "C".


ELEVATIONS:

1. Note and specify all roof slopes appropriate to material (see R905).

2. For thincoat stucco systems over foam board, note and specify the ICBO evaluation report number, system name and manufacturer. Note and specify the vapor barrier.

1. PLUMBING PLANS:

2. Specify compliance with water conservation: water closets 1.6 gallons per flush, sinks and shower heads 3 gallons per minute , per ARS.

1. Show exhaust fan locations for bathrooms, water closet compartments and laundry rooms in lieu of operable windows, per R303.3.

ELECTRICAL PLANS:

1. A receptacle outlet shall be provided adjacent to the basin in each bathroom, per E3801.6. Bathroom outlets shall be on a separate 20-amp circuit with no other outlets, per E3603.4..
03/09/2001 MVALDEZ WWM REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
03/09/2001 MVALDEZ OUT TO CUSTOMER Completed