Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T01CM00456
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/08/2001 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | |
02/20/2001 | JIM EGAN | FIRE | REVIEW | Approved | |
02/21/2001 | TGRIFFUS | WWM | REVIEW | Denied | |
02/26/2001 | TGRIFFUS | WATER | REVIEW | Approved | |
02/27/2001 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Approved | |
02/28/2001 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. A/C-1 and A/C-2 do not comply with Sec608UMC1994 NOTE: The main bathrooms are part of the rated corridor system. Fire/smoke dampers will be required on all penetrations. |
02/28/2001 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Model energy code calculations are not with plan set. They shall comply with the Civano Energy code. 2. A/C-! and A/C-2 do not comply with Sec608UMC1994. NOTE: The main bathroom is part of the rated corridor system. Provide Fire/Smoke dampers at all penetrations. |
03/05/2001 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | ED.1 1) Clarify the intent of the hexagon with a 1.3 inside it. E2.1 1) It appears circuits E-13,15,17 and E-7,9,11 should circuit to panel G. 2) The 99NEC 424-3(a) will allow a maximum 30 amp circuit when serving more than 1 heater. In addition the 99NEC 424-3(b) requires the circuit (including motors) to be rated at 125%. Thus E-20,22,24…E-7,9,11… E-13,15,17…H-2,4,6… H-1,3,5 are loaded beyond 30amps. The loads at 125% for E-2,4,6…E-14,16,18 are greater than 20 amps and H-7,9,11 and H13,15,17 are greater than 40 amps. Reference sheet E-8.1. 3) The exam and therapy rooms are required to comply with 99NEC 517-13. 4) The disconnects protecting the TU's should be specified. The 99NEC 424-3(b) requires the overcurrent device to rated a minimum of 125% of the load of heaters and motors. 5) Circuit F-31,36 serving the pottery wheels is incorrect it should be F-32,34,31. 6) The 99NEC 210-63 requires a GFI maintenance receptacle to be placed within 25' of the HVAC equipment. 7) The reference to the service meter location appears incorrect. 8) Page E8.1 indicates circuit E-3 serves EF2 however it is not circuited to E-3 on page E2.1. E2.2 1) Circuit E-29 is overloaded. Approximately 23.3 amps at 125%. 2) Circuit E-27 is used twice (receptacles page E2.1 and lights page E2.2). 3) Circuit E-25 is used twice (receptacles page E2.1 and lights page E2.2). 4) There are 3 C fixtures in the reception area appear to be connected to the wrong circuit. It appears the correct circuit is E-23. 5) The keynotes on the page do not coincide with the keynote legend. 6) The canopies are perforated metal allowing for 23% open area therefore the P fixtures cannot be directed upward. See page A4.2 detail 13. Page 2 of 2 E8.1 1) Circuit F-25,27 requires a minimum #6 cu. 2) Panel E load is approximately 235 amps however is rated 200 amps and is served by a 200 amp circuit. 3) Circuit H-26 appears in panel however the circuit is not called out on detail 4 on page E2.2. GENERAL COMMENTS 1) Provide specifications. 2) Provide model energy calculations. 3) Provide fault current analysis. All of the equipment bracing appears correct with the exception of Panel E. Due to comment E8.1 #2 the feeder will have to be increased in size thus the 14k bracing is not adequate. 4) Provide fixture cuts and catalog numbers for exterior lights. 5) The scale page E.1 does not appear correct. 6) Please include the plans I have already reviewed along with your next submission. They are highlighted with yellow marker. |
03/27/2001 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Denied | |
03/27/2001 | DROBEY | FLOODPLAIN | REVIEW | Needs Review |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/14/2001 | JKOZUCH | OUT TO CUSTOMER | Completed |