Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T01BU03252
Review Name: GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/08/2002 | MATT FLICK | ENGINEERING | REVIEW | Denied | ENGINEERING: Differential grading has still not been adequately addressed. The covenant submitted by the applicant seems to be on their own property, when, it needs to be on the neighbor's property. Or, follow the standard differential grading procedure which involves approval from the adjacent properties. |
08/14/2002 | LOREN MAKUS | NPDES | REVIEW | Denied | Provide the following information on the Stormwater Pollution Prevention Plan. ? A signed project manager/owner certification and a contractor's certification ? Project title block with name and address of project ? Legend identifying grades, symbols lines, etc. ? Symbols for designated concrete washout area, silt fence, rip-rap, discharge locations. Stormwater Pollution Prevention Plan content Site and Project Description ? Total area of site, area to be disturbed (including off-site borrow and fill areas) ? Run-off coefficient for pre-construction and post-construction conditions ? Discharge locations ? Copy of the permit requirements/language ? Sediment basin meets required design capacity Site Map ? Drainage patterns ? Approximate slopes after major grading ? Areas of soil disturbance ? Areas which will not be disturbed ? Stormwater discharge locations Stabilization Practices ? Description of interim stabilization practices ? Description of permanent stabilization practices ? Type of stabilization used and location Inspection Reports ? Name & qualification of inspector ? Date ? Major observations ? Sediment removal if sediment trap's design capacity is reduced by 50%. ? If everything is okay, certification that facility is in compliance with SWPPP. ? Plan to be updated as necessary. Also see red-lines on plan sheets. |
08/16/2002 | PATRICIA GILBERT | NPPO | REVIEW | Denied | A pre-permit inspection is required, to schedule please call 791-5550 ext. 140. |
08/16/2002 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | See engineering, floodplain and NPPO comments. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/20/2002 | TAMI ACHONG | OUT TO CUSTOMER | Completed |