Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T01BU03035
Parcel: 140190100

Address:
5418 S PARK AV

Review Status: Completed

Review Details: GRADING

Permit Number - T01BU03035
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2002 JOE LINVILLE NPPO REVIEW Denied Approved site and Native Plant Preservation Plans, and Pre-Permit Inspection required. Call 791-5550 ext 118 to schedule after preservation plan is approved.
01/11/2002 MATT FLICK ENGINEERING REVIEW Denied Engineering/Floodplain:

1. Drainage report must be approved before site plan approval. Site plan must be approved before grading plan approval.

2. Basin and channel are drawn incorrectly. Draw both in their actual location based on setbacks from property lines and existing and proposed grades.

3. All drainage construction must be constructed within Phase 1.

4. The International Building Code (IBC) is the current code used for grading.

5. Delete the "Type 2 grading note" as this applies in Pima County, not the City of Tucson.

6. Engineered grading requires a soils engineering report and an engineering geology report per Chapter 36 of the IBC, including local amendments. The soils report should also evaluate the specific material to be used berms along the channel and retention basin.

7. A Floodplain Use Permit is required prior for any work performed in the regulatory floodplain. A portion of this site is shown to be within a City of Tucson flood hazard area.

8. The portion of the "bleed pipe" into Nebraska Wash must be RCP or DIP since Nebraska Wash is a public drainageway. The dedication information for Nebraska Wash should be shown. The decision on whether to allow the "bleed pipe" will not be made until the results of the required percolation test are given within the drainage report.

9. Show the 100-year floodplain.

10. Show extent of grading.

11. Erosion protection and grade control are necessary where the channel plunges into the basin.

12. The Bottom elevation and WSEL as shown on the plan view differ from that shown on Cross-Section B-B (that's both the B-B on the left and the one on the right).
01/11/2002 MATT FLICK FLOODPLAIN REVIEW Denied See comments in Engineering folder.
12/26/2001 PATRICIA GEHLEN ZONING REVIEW Denied

Final Status

Task End Date Reviewer's Name Type of Review Description
01/15/2002 MONICA VALDEZ OUT TO CUSTOMER Completed