Permit Number: T00CM05667
Parcel: 117061660

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T00CM05667
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2001 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Denied 1. SEE PRIOR COMMENT #1. 1.1. PROVIDE REGISTRANT'S SEAL FOR NON-STRUCTURAL ITEMS ON DRAWINGS S1 & S2. 1.2. SHOW ALL NEW MECHANICAL UNITS MOUNTED ON ROOF. 1.3. COORDINATE OPERATING WEIGHTS FOR MECHANICAL UNITS MOUNTED ON ROOF/FLOOR OR SUSPENDED FROM ROOF/FLOOR WITH STRUCTURAL AND MECHANICAL DESIGNS. 1.4. PROVIDE STRUCTURAL ANALYSIS ADDRESSING EXISTING LOADS ON STRUCTURE AND NEW LOADS ON STRUCTURE; INCLUDING THREE NEW CONDENSING UNITS, THREE NEW FAN COIL UNITS , HOOD CHASE/S/ HOOD/ EXHAUST, etc. 2. SEE PRIOR COMMENT #2. SHOW ,ON DRAWING, BY ESTIMATE EXPLAINING WHERE 20% OF PERMIT VALUATION IS SPENT ON ACCESSIBILITY. 3. SEE PRIOR COMMENT #3. ADDRESS LOADS NEW AND EXISTING IN CALCULATIONS. 4. SEE PRIOR COMMENT #4. ADDRESS LOADS SUPPORTED BY ROOF/FLOOR. 5. SEE PRIOR COMMENT #5. CLARIFY OCCUPANCIES : ie: HOTEL OFFICE = ' B' OCCUPANCY HOTEL OFFICE STORAGE = 'S1' OCCUPANCY DRY STORAGE = 'S1' OCCUPANCY CLUB CONGRESS = 'A3' OCCUPANCY 2ND FLOOR = 'R1' OCCUPANCY AND CODE REQUIRED OCCUPANCY SEPARATIONS PER UBC CHAPTER 3, TABLES 3A & 3B, COORDINATE CODE REVIEW CHECKLIST AND DRAWINGS. 6. SEE PRIOR COMMENT #6. PER UBC CHAPTER 7. 7. SEE PRIOR COMMENT #7. SHOW COMPLIANCE ON DRAWINGS. 8. SEE PRIOR COMMENT #8. PROVIDE PERMITS FOR CHANGE OF OCCUPANCY FROM RETAIL 'M' OCCUPANCY TO : BANQUET ROOM - 'A3' OCCUPANCY DRY STORAGE - 'S1' OCCUPANCY HOTEL OFFICE STORAGE - 'S1' OCCUPANCY SERVER AREA - 'B' OCCUPANCY INCLUDING ARCHITECT'S DRAWINGS AND ANALYSIS PER UNIFORM ADMINISTRATIVE CODE SECTION 3 AND COMBINING ADDRESSES PER PIMA COUNTY ADDRESSING. PRIOR COMMENTS ATTACHED.
01/05/2001 TGRIFFUS WATER REVIEW Approved
01/08/2001 RAY MORGAN WWM REVIEW Denied
12/14/2000 RANDY SCHULER ELECTRICAL-COMMERCIAL REVIEW Approved
12/15/2000 HOLLY PEARCE PLUMBING-COMMERCIAL REVIEW Approved
12/19/2000 HOLLY PEARCE MECHANICAL-COMMERCIAL REVIEW Denied Mechanical 1. Architect and Structural engineer need to get together on the construction of the One Hour chase required for the Type-1 hood. Two separate chases are required for the Two Hoods Per Sec 507.6 UMC1994.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/08/2001 DELMA ROBEY OUT TO CUSTOMER Completed