Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T00CM05667
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/22/2000 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 11/22/2000 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Approved | |
| 11/24/2000 | JIM EGAN | FIRE | REVIEW | Approved | |
| 11/27/2000 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. Gas line changing sizes from 2" to 1 1/2" to 2" in detail #1 and #3. Fix- 2" is required. Provide the manual shut off valve up stream of the union ( fire system). 2. Provide the manufactures name and listing for the plumbing fixtures. |
| 11/27/2000 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Architect of record shall provide a complete detail of the 1hr chase required for the type-I hoods. This shall inclued the construction and the support. ( also the hood to the structure) NOTE: Two exaust outlets are required for the 14ft hood--Sec508.9 UMC1994 2. Provide the manufactures name and listing for the hoods. Provide the CFM data from the manufacture to support the CFM's given on the plan. 3. Show how access is obtained for the equipment on the roof. |
| 11/29/2000 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | 1 . PROVIDE READABLE DRAWINGS S-1 & S-2, FOR REVIEW. 2. SHOW ON DRAWINGS WHERE 20% OF PERMIT VALUATION IS SPENT ON ACCESSIBILITY PER UBC SEC 11 AS AMENDED, SEC 1110, 1112. 3. PROVIDE A COPY OF THE STRUCTURAL CALCULATIONS, FOR REVIEW. 4. PROVIDE STRUCTURAL ANALYSIS ADDRESSING NEW AND RELOCATED EQUIPMENT ON ROOF , REF M-2; HP/1, HP/2, HP/3, EC-1 AND LOADS FROM DUCTS AND ROOF SUPPORTTED EQUIPMENT IE; HOODS, ETC, REF M-1 & M-3. 5. DEFINE AND SHOW MIXED OCCUPANCIES ON CODE REVIEW CHECKLIST AND ON DRAWINGS. 6. SHOW ON DRAWINGS HOW FIRE RATINGS ARE MAINTAINED, PROVIDE COPY OF FIRE LISTING/S ON DRAWINGS AS WELL AS CONSTRUCTION DETAILS CONFORMING TO LISTING. 7. CLARIFY EXITING PER UBC CHAP 10 AND CHAP 11 , AS AMENDED, INCLUDING EXIT DOORS, EXIT SIGNAGE, RAMPS, STAIRS, HARDWARE,ETC. 8. CLARIFY OCCUPANT LOADS ON DRAWINGS . |
| 12/04/2000 | CBUFORD | WWM | REVIEW | Passed | |
| 12/04/2000 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | GENERAL COMMENTS 1)This comment sheet represents a partial review only.The plan contains many inaccuracies, much of the design is illegible, and the plans have been modified extensively without regard to how it impacts the remainder of the design. Provide a revised set of plans that accurately reflect the scope of work. 2) Please return the plans I have reviewed along with your next submission. E-1 1) I could not locate keynote #7 on the electrical floor plan. 2) Panel B lacks proper work clearance. 3) Six new B fixtures lack a circuit number. 4) Circuit F-11 lacks a load in the panel on page E-2. E-2 1) Circuit F-8 has load in the panel of 3600VA. 2) Circuits F-10 and 12 are on the plan however there is not a load in the panel. In addition circuit F-8 is used twice. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/13/2000 | CLAUDIA BUFORD | REJECT SHELF | Completed |
| 12/13/2000 | CLAUDIA BUFORD | APPROVAL SHELF | Completed |
| 12/06/2000 | CLAUDIA BUFORD | OUT TO CUSTOMER | Completed |