Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T00CM05633
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/08/2001 | BOB SUBA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES ELECTRICAL REVIEW COMMENTS 1) Provide the nameplate current on the mechanical equipment. 2) Provide data on the UPS system. Is there a main and separate overcurrent devices on the UPS? 3) Provide a complete single line diagram of the electrical service. 4) Show location, service capacity, calculated loads, conduit and wire sizes, fault current analysis, ect. 5) Provide complete panel schedule showing the circuit numbers, loads in VA, phasing and description. 6) Provide a load calculation showing the loads on all phases. (Balance all loads within 15% of each other. Add 25% for continuous loads. 7) Provide fixture wattages and total watts including ballast losses. 8) The transformers shall be grounded per 99NEC 250-30(3)(a)(b). 9) Provide information on capabilities of the buck-boost transformer.All the data I have show that they have a limit + or - 20%. 10) Provide sizing of grounding electrode conductor (at transformer) 11) Provide size of flex.metalic conduit |
11/21/2000 | DOUG WILLIAMS | FLOODPLAIN | REVIEW | Approved | |
11/21/2000 | JIM EGAN | FIRE | REVIEW | Approved | |
11/21/2000 | RAUL PALMA | BUILDING-COMMERCIAL | REVIEW | Approved | |
11/21/2000 | PETER MCLAUGHLIN | ZONING | REVIEW | Passed | |
11/22/2000 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Passed | |
11/22/2000 | RAY MORGAN | WWM | REVIEW | Passed | |
11/22/2000 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Provide all of the equipment data on the plan. 2.The dry well is to be 60 inch. deep. 3. PVC can not be used in this type building. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/02/2001 | TAMI ACHONG | APPROVAL SHELF | Completed |
12/04/2000 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
11/24/2000 | TAMI ACHONG | REJECT SHELF | Completed |
11/24/2000 | TAMI ACHONG | REJECT SHELF | Completed |