Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T00CM05496
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/13/2000 | PATRICIA GEHLEN | ZONING | REVIEW | Passed | |
| 11/21/2000 | JIM EGAN | FIRE | REVIEW | Approved | |
| 12/18/2000 | PHIL SEADER | BUILDING-COMMERCIAL | REVIEW | Denied | SH A4.4 DET. 3 WALL SECTION @ C.R.106 FIRESTOP FURR OUT @ TERMINATION OF GYP. BD. DET. 4 DETAIL FRAMING AT SKLYLIGHT. SPACING AND CONNECTIONS. DETAIL SUSPENSION OF GYP. BD. CLG. SH A4.3 NOT SUBMITTED. LOOKING FOR DET. 2 & 3 SH. A4.3. SH. 6.2 DETAIL TRANSITION DOWN TO 7' 2" GWB FROM ACT ACT 8'6" MAINTAIN 1 HR RATED CEILING CONST. SH. A8.0 PROVIDE OVERFLOW SCUPPER THROUGH PARAPET ADJACENT TO DOWNSPOUTS OR DROP TOP OF LEADERBOX TO INVERT OF SCUPPER THROUGH PARAPET. DET. 20 WHERE DOES IT OCCUR? DETAIL 16 PROVIDE ONE HOUR RATED TRANSITION BETWEEN GYP. BD. CLG. OF ACOUSTICAL PANELS. |
| 12/19/2000 | RANDY SCHULER | ELECTRICAL-COMMERCIAL | REVIEW | Denied | E-3.1 1)Circuit H5 appears overloaded. 45 D fixtures X 105 VA/fix = 4725vA. 4725VA / 277V = 17A. 17A (X) 125% = 21.3A 2) There is not a G type fixture in the schedule however there are 15 G fixtures on the plan. E3.2 1) The loads serving circuits L-2, 12,11,9, and 7 appear incorrect. 2) It does not appear panel schedule L matches the plan (i.e.) L-1, 3, 5, and 11. 3) A receptacle serving a TV in room 103 lacks a circuit number. 4) Describe the Air Conditioner disconnects and fuse requirements. E3.4 1) The ground from the transformer secondary to panel L must be a number 4 copper minimum. 99NEC 250-102(c). 2) The neutral serving the panel CPC must be a minimum of 1/0. 99NEC 310-4 3) Provide panel CPB ampacity. GENERAL COMMENT 1) Provide an MEC lighting budget analysis. |
| 12/20/2000 | HOLLY PEARCE | PLUMBING-COMMERCIAL | REVIEW | Denied | Plumbing 1. Provide a complete waste line isometric drawing. 2. Provide the total length of 3/4" MPG line on the plan. Note: P1.2 indicates this line as 1/2"--- which is it? 3. Provide a manual shut off valve ahead of the pressure regulator per Sec1218.5UPC1994. 4. Provide the total length of gas line down stream of the pressure regulator on the plan. 5. Provide the manufactures name and listing for all of the plumbing fixtures on the plan. |
| 12/20/2000 | HOLLY PEARCE | MECHANICAL-COMMERCIAL | REVIEW | Denied | Mechanical 1. Architectural detail 3 on A4.4 does not meet the Model Energy Code. 2. How come there are TWO detail 14's on sheet A-8.0. Note: Call outs on sheet A-7.2. Indicate on sheet A-8.0 an Over Flow Roof Drain detail. Note: If the parapet between the old building and the new building is 30" or higher, a cross over ladder will be required-- Sec 321.8 #3 UMC1994. 3. All penetrations into the rated corridor will require a Fire/Smoke damper. Provide and show on the plan. |
| 12/22/2000 | RAY MORGAN | WWM | REVIEW | Approved | |
| 12/22/2000 | CBUFORD | WATER | REVIEW | Approved | |
| 12/27/2000 | CBUFORD | FLOODPLAIN | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/12/2001 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 01/12/2001 | DELMA ROBEY | REJECT SHELF | Completed |
| 01/12/2001 | DELMA ROBEY | APPROVAL SHELF | Completed |