Plan Review Detail
Review Status: Active
Review Details: LOT SPLIT REVIEW
Plan Number - S22-066
Review Name: LOT SPLIT REVIEW
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/07/2022 | SBEASLE1 | START | PLANS BEING WALKED THRU | Completed | |
| 10/07/2022 | ANY | ZONING-RECORDATION | REVIEW | Active | |
| 10/07/2022 | ANY | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Active | |
| 10/10/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 10/10/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. With the property line so close to the existing building, show that the building meets commercial building standards. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 10/12/2022 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Paul Camarena PDSD Zoning Review Section PROJECT: 2865 N TUTTLE AV Land Split (1st Review) S22-066 TRANSMITTAL DATE: 10/11/2022 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) 8.3.1 Land Split and Administrative Manual (AM) Section 2-08. Also compliance with applicable development criteria for the proposed or existing use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 8.3.1. LAND SPLIT 2-08.5.0 CONTENT REQUIREMENTS The drawing showing the proposed land split shall include the following: A. The boundaries of the original parcel or lot prior to the land split with distance and bearings labeled; C. The rights-of-way adjacent to or within the property, including streets and easements. The streets and easements must be labeled, dimensioned and purpose listed; E. The locations and dimensions of any existing structures and buildings; F. The setbacks of existing buildings and structures from existing and proposed property lines; G. The land area of each proposed lot in square feet or acreage. If the property is developed, additional information, such as but not limited to FAR, lot coverage, vehicle and bicycle parking, may be needed; :Provide vehicle and bicycle parking as noted by the standard above., If you have any questions about this transmittal, Contact Paul Camarena at (520) 837-4986 or by email Paul.Camarena@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 10/16/2022 | JGARCIA1 | BUILDING-COMMERCIAL | REVIEW | Reqs Change | Building Review 1) Provide setbacks of existing buildings and structures from existing and proposed property lines. 2) Seperate permitting may be required for review of the existing building to verify fire seperation distance requirments per IBC 2018. |