Plan Review Detail
Review Status: Active
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S22-056
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Active
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/15/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 09/15/2022 | ANY | LANDSCAPE | REVIEW | Active | |
| 09/15/2022 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Pima County Wastewater by email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the Mayor and Council will grant their approval. |
| 09/15/2022 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
| 09/15/2022 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | |
| 09/15/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the Mayor and Council can grant their approval. |
| 09/15/2022 | KAY MARKS | PIMA COUNTY | ADDRESSING | Active | |
| 09/15/2022 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | |
| 09/15/2022 | ANY | ZONING-DECISION LETTER | REVIEW | Active | |
| 09/22/2022 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | (View the FACILITIES MAP in the Documents section of PRO, titled, "TEP facilities map, 09/21/22") email from: TEP-DEVREV <TEPDEVREV@tep.com> To: CDRC 09/21/2022 Tucson Electric Power Co. (TEP) has reviewed and has no objection to Savannah Court, Lots 1 and 2, submitted on September 15th,2022. There are existing TEP FACILITIES (see map) within the boundaries of the plat. Costs for removing or relocating existing TEP facilities will be billable to the developer. Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required for new TEP facilities, they will be obtained by separate instrument. Tucson Electric Power Co. Land Resources Department |
| 09/22/2022 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | FROM: Judy Hertel, GIS Cartographer Pima County Assessor's Office DATE: September 20, 2022 RE: Assessor's Review and Comments Regarding: Savannah Court S22-056 X Plat meets Assessor's Office requirements |
| 09/30/2022 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. Include in the next submittal a copy of the current title report. 2. Show the site approximately center of the project location map. 3. In the certification of approval fill in Suzanne Mesich as the city clerk and include a line below on which to sign and date. 4. Revise the dedication language to define what the 24' access easement does per Admin Manual 2-07.5.3.B.2. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
| 10/04/2022 | JIM EGAN | COT NON-DSD | FIRE | Completed | Questions: Jennifer Peel-Davis Tucson Fire Department Fire Plans Examiner Fire Inspector I, II and Fire Alarm Plans Examiner Jennifer.Peel-Davis@Tucsonaz.gov Desk: 520-837-7033 |
| 10/04/2022 | JPEELDA1 | COT NON-DSD | PARKS & RECREATION | Approved | email from: Howard Dutt To: CDRC 10/03/2022 No existing or proposed Tucson Parks and Recreation facilities are affected by this Minor Subdivision. Howard Dutt, RLA Project Manager/Landscape Architect Parks and Recreation | City of Tucson Howard.Dutt@tucsonaz.gov main 520.631.2030 |
| 10/05/2022 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Completed | |
| 10/12/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Paul Camarena PDSD Zoning Review Section PROJECT: 4711 E FAIRMOUNT AV Final Plat (1st Review) S22-056 TRANSMITTAL DATE: 10/12/2022 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant’s risk since changes could be required of the tentative that may affect the final plat. 2-07.4.0 FORMAT REQUIREMENTS Plats must: 4.1 Be on a 24-inch by 36-inch sheet(s) folded to the eight and one-half inch by 11-inch format shown in Exhibit I. The plat may comprise several sheets showing various elements of required data; 4.2 Be prepared on materials that can be transferred to double-matt Mylar reverse read; 4.3 Have a two-inch margin on the left side and one-half inch margins on the remaining sides to comply with standardization requirements of state law for recorded plats; 4.4 Be drawn to a scale of no more than one inch equals 40 feet; and, 4.5 All lettering and dimensions shall be three-thirty-seconds inch in height. 2-07.5.0 CONTENT REQUIREMENTS 5.1 General 2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information: 2-07.5.1.A.1 The project site approximately centered within a one square mile area; 1. COMMENT: on the location map center the property as noted by the standard above. 2-07.5.1.A.2 Label the section, township, and range; section corners; north arrow; and the scale; 2. COMMENT: Label the section corners as noted by the standard above. 2-07.5.1.A.3 Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and, 3. COMMENT: Label all subdivisions and arterial and collector streets as noted by the 2-07.5.2 General Notes The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information. 2-07.5.2.J If applicable, add the following note: “This subdivision is subject to Ordinance No. ____ which established zoning in the _____________________ Annexation Area.” 4. COMMENT: Provide the information noted by the standard above “” 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2-07.5.3.D Approval and Recording Data Blocks The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows. APPROVAL “I, (fill in name of current City Clerk), Clerk of the City of Tucson, Arizona, hereby certify that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this ____ day of __________, 20__.” ____________________________________________ ______________ Clerk, City of Tucson Date Sequence________________ Fee_____________________ State of Arizona County of Pima I hereby certify that the instrument was filed for record at the request Of__________________________ Date________________________ Time_________________________ Witness my hand and Official Seal day and year above written. Gabriella Cazares-Kelly , County Recorder BY___________________________ Deputy 5. COMMENT: Provide the information noted above 2-07.5.4 Proposed Subdivision Information Provide the following information on the plat: 2-07.5.4.G. Corner lots may be designated with a star symbol indicating which street will be used for access. Use of this designation may limit design options for access. In instances where the city, for safety reasons, limits accessibility, a one-foot no-access easement will be required; 6. COMMENT: Provide the information noted by the standard above. 2-07.5.6 Protective Covenants Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will: 2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and 7. COMMENT: If the access easement is still being proposed provide the information noted by the standard above. If you have any questions about this transmittal, Contact Paul Camarena at (520) 837-4986 or by email Paul.Camarena@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 10/13/2022 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | Correct the street name of Fairmount Ave to Fairmount Street |