Plan Review Detail
Review Status: Active
Review Details: FINAL PLAT - REVIEW
Plan Number - S22-054
Review Name: FINAL PLAT - REVIEW
Review Status: Active
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/12/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
09/12/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
09/12/2022 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
09/12/2022 | ANY | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Active | |
09/12/2022 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Pima County Wastewater by email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
09/12/2022 | ANY | ZONING-DECISION LETTER | REVIEW | Active | |
09/12/2022 | ANY | PIMA COUNTY | ADDRESSING | Active | |
09/14/2022 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
09/20/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Shiner Armory Park Lots 1 - 6 FINAL PLAT (1st Review) S22-054 TRANSMITTAL DATE: September 20, 2022 DUE DATE: October 03, 2022 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 2-07.5.0 CONTENT REQUIREMENTS 1. COMMENT: 2-07.5.1.H – Provide the subdivision case number, S22-054, and the development package case number, DP22-0226, in the lower right corner of the plat next to the title block on all sheets. 2. COMMENT: Until DP22-0226 is approved Zoning cannot approve this final plat. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp |
09/20/2022 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | TO: City of Tucson Development Services FROM: Suzanne Gilpin, GIS Cartographer Pima County Assessor’s Office, (520)724-4387 DATE: September 12, 2022 RE: Assessor’s Review and Comments Regarding Final Plat- S22-054 – SHINER ARMORY PARK 1ST SUBMITTAL X Plat meets Assessor’s Office requirements. |
09/22/2022 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | email from: TEP-DEVREV <TEPDEVREV@tep.com> Sent: Wednesday, September 21, 2022 8:20 AM To: CDRC <CDRC@tucsonaz.gov> Subject: S22-054 TEP has reviewed plans received on September 12th, 2022, the plat for the Shiner Armory Park, Lots 1 through 6 subdivision. Please note that TEP is awaiting customer approval of the Preliminary Construction Design. Customer approval and a copy of the Approved Tentative Plat are required for TEP to prepare a final Construction Drawing. If revisions to the preliminary design are needed, easements are required for TEP facilities if not appropriately recorded on the final subdivision plat. They will need to be obtained by a separate instrument. Costs for removing or relocating existing TEP facilities will be billable to the developer. The customer is responsible for compliance with City Ordinances. Please note a jurisdictional permit for any work on a public road right of way where applicable. Tucson Electric Power Co. Land Resources Department |