Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S22-054
Parcel: Unknown

Address:
275 E 18TH ST

Review Status: Active

Review Details: FINAL PLAT - REVIEW

Plan Number - S22-054
Review Name: FINAL PLAT - REVIEW
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
09/12/2022 SBEASLE1 START PLANS SUBMITTED Completed
09/12/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change To: Applicant
From: Planning & Development Services Dept.

Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the final step of Mayor and Council's approval of the FINAL PLAT.
09/12/2022 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
09/12/2022 ANY OTHER AGENCIES TUCSON AIRPORT AUTHORITY Active
09/12/2022 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change To: Applicant
From: Planning & Development Services Dept.

Contact Pima County Wastewater by email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the final step of Mayor and Council's approval of the FINAL PLAT.
09/12/2022 ANY ZONING-DECISION LETTER REVIEW Active
09/12/2022 ANY PIMA COUNTY ADDRESSING Active
09/14/2022 SBLOOD1 ENGINEERING REVIEW Approved
09/20/2022 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Shiner Armory Park Lots 1 - 6
FINAL PLAT (1st Review)
S22-054

TRANSMITTAL DATE: September 20, 2022

DUE DATE: October 03, 2022

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
2-07.5.0 CONTENT REQUIREMENTS
1. COMMENT: 2-07.5.1.H – Provide the subdivision case number, S22-054, and the development package case number, DP22-0226, in the lower right corner of the plat next to the title block on all sheets.

2. COMMENT: Until DP22-0226 is approved Zoning cannot approve this final plat.
If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov.
To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp
09/20/2022 ED ABRIGO PIMA COUNTY ASSESSOR Approved TO: City of Tucson Development Services

FROM: Suzanne Gilpin, GIS Cartographer
Pima County Assessor’s Office, (520)724-4387

DATE: September 12, 2022

RE: Assessor’s Review and Comments Regarding Final Plat-
S22-054 – SHINER ARMORY PARK 1ST SUBMITTAL

X Plat meets Assessor’s Office requirements.
09/22/2022 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change email from: TEP-DEVREV <TEPDEVREV@tep.com>
Sent: Wednesday, September 21, 2022 8:20 AM
To: CDRC <CDRC@tucsonaz.gov>
Subject: S22-054

TEP has reviewed plans received on September 12th, 2022, the plat for the Shiner Armory Park, Lots 1 through 6 subdivision.

Please note that TEP is awaiting customer approval of the Preliminary Construction Design. Customer approval and a copy of the Approved Tentative Plat are required for TEP to prepare a final Construction Drawing.

If revisions to the preliminary design are needed, easements are required for TEP facilities if not appropriately recorded on the final subdivision plat. They will need to be obtained by a separate instrument. Costs for removing or relocating existing TEP facilities will be billable to the developer. The customer is responsible for compliance with City Ordinances.

Please note a jurisdictional permit for any work on a public road right of way where applicable.

Tucson Electric Power Co.
Land Resources Department