Plan Number: S22-049
Parcel: Unknown

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S22-049
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/15/2022 SBEASLE1 START PLANS SUBMITTED Completed
08/15/2022 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
08/15/2022 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change To: Applicant
From: Planning & Development Services Dept.

Contact Pima County Wastewater by email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the final step of Mayor and Council's approval of the BLOCK PLAT.
08/15/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change To: Applicant
From: Planning & Development Services Dept.

Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the final step of Mayor and Council's approval of the Block Plat.
08/15/2022 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
08/15/2022 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
08/17/2022 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Sunbelt Ranch Lots 2 - 9
FINAL PLAT (1st Review)
S22-049

TRANSMITTAL DATE: August 17, 2022

DUE DATE: August 23, 2022

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
2-07.5.0 CONTENT REQUIREMENTS
2-07.5.1 General
1. COMMENT: 2-07.5.1.A.2 – The southeast section “29” is not correct and should be 27.

2. COMMENT: 2-07.5.1.A.3 - Label all subdivisions on the location map.

3. COMMENT: 2-07.5.1.A.4. The city’s jurisdictional limits, if within the mapped area.
2-07.5.1.E. Provide a title block in the lower right corner of each sheet with the following information:
4. COMMENT: 2-07.5.1.E.3 – As this subdivision is a resubdivision of a previously recorded plat, indicate the title and the book and page/sequence number reference of the existing subdivision within the title block.

5. COMMENT: 2-07.5.1.H - The subdivision case number, S22-049, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.

2-07.5.2 General Notes
6. The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information.

7. 2-07.5.2.J – General Note 11 is not correct.

2-07.5.3 Standard Paragraphs
8. COMMENT: 2-07.5.3.D - The City Clerk’s & County Recorder’s names are not correct.

9. COMMENT: General Note 13 is not correct.

10. COMMENT: Remove all “PERMITTING NOTES” as they are not applicable.
If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov.
To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp
08/22/2022 AWARNER1 LANDSCAPE REVIEW Approved
08/25/2022 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Completed
08/29/2022 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change FROM: Suzanne Gilpin, GIS Cartographer
Pima County Assessor’s Office, (520)724-4387

DATE: August 22, 2022

RE: Assessor’s Review and Comments Regarding Final Plat-
S22-049 SUNBELT RANCH FINAL PLAT – 1ST SUBMITTAL

__X___ Plat does not meet Assessor’s Office requirements.

COMMENTS:

The title block must be in the lower right-hand corner: It must have the number of lots
or units or block or elements or any combination of these. It must have the common areas listed if there are any. It must have the section, township, and range and if it is a
resubdivision, it must mention the plat name and the map & plat. (See SQ20181310721 M&P)

There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision

All Adjacent subdivisions should be named, with map and plat in the appropriate areas around the subdivision.

Ruby Holdings LLC is the current owner of property NOT Rita Ranch Industrial Financial Group. Deed must be recorded prior to recording plat.
08/29/2022 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved Email from: Howard Dutt
To: CDRC
08/22/2022

No existing or proposed Tucson Parks and Recreation facilities are affected by this Block Plat.

Howard Dutt, RLA
Project Manager/Landscape Architect

Parks and Recreation | City of Tucson
Howard.Dutt@tucsonaz.gov
main 520.631.2030
08/29/2022 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
09/06/2022 JIM EGAN COT NON-DSD FIRE Completed Questions:
Jennifer Peel-Davis
Tucson Fire Department
Fire Plans Examiner
Fire Inspector I, II and Fire Alarm Plans Examiner
Jennifer.Peel-Davis@Tucsonaz.gov
Desk: 520-837-7033
09/08/2022 SBLOOD1 ENGINEERING REVIEW Reqs Change 1. The title block needs to reference the previous plat that this is a replat of.
2. Update the approval block with the current city clerk Suzanne Mesich and county recorder Gabriella Cazares-Kelly.
3. General note 13 and Permitting Note 5 both make reference to what seems to be a different plat, revise the notes for this plat.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
09/12/2022 KAY MARKS PIMA COUNTY ADDRESSING Needs Review
09/12/2022 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved Approved.
View in DOCUMENTS section of PRO, titled, "TEP letter of approval 09.01.22", "TEP facilities map 09.01.22", and "TEP redline page lines and poles 09.01.22".
09/16/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change email from: COTDSDPermits
To: Paul Nzomo
Sept. 16, 2022

Returned for Corrections: S22-049
BLOCK PLAT - Sunbelt Ranch, Lots 2 through 9 (no Lot One). Replat to Block Plat.
8901 E OLD VAIL RD

FEE BALANCE: $ 1116.50
ONLINE PAYMENTS
** If the online amount doesn't match "Fee Balance" above, check again in a few hours **
https://www.tucsonaz.gov/pdsd/fees
1- Click on: Pay Planning & Permit Fees
2- Enter Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave this blank
4- "Continue"
5- In the Pay column - check the boxes

YOUR NEXT STEPS
1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on the blue tab
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter

3. UPLOAD documents to Filedrop:
- Comment Response Letter (your response to REQUIRES CHANGE comments)
- Plan Set (all pages, full set, even if no changes were made)
- Documents requested by review staff

FILEDROP
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- "Existing Application"
- "Permit Number" field: enter the number (and any notes for our staff)


Sharon Beasley
Certified Permit Specialist

City of Tucson, Planning & Development Services Dept.
Email: COTDSDpermits@TucsonAz.gov
(for development packages, land splits, Thursday Presubmittal meetings)
Email: PDSDinquiries@TucsonAz.gov
(for building permits)