Plan Number: S22-044
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S22-044
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/15/2022 SBEASLE1 START PLANS SUBMITTED Completed
07/15/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change To: Applicant
From: Planning & Development Services Dept.

Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the final step of Mayor and Council's approval of the FINAL PLAT.
07/15/2022 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
07/15/2022 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change To: Applicant
From: Planning & Development Services Dept.

Contact Pima County Wastewater at email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the final step of Mayor and Council's approval of the FINAL PLAT.
07/27/2022 STEVE SHIELDS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: The Reserve at Valencia Crossing, Lots 1 - 50 – Final Plat
FINAL PLAT (1st Review)
S22-044

TRANSMITTAL DATE: July 27, 2022

DUE DATE: August 01, 2022

The Zoning Review Section conditionally approves the final for this project. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.
2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
2-07.5.0 CONTENT REQUIREMENTS
1. COMMENT: 2-07.5.1.H – Provide subdivision case number, S22-044, assigned to this plat in the lower right corner of the plat next to the title block on all sheets.
If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov.
To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp
07/29/2022 ED ABRIGO PIMA COUNTY ASSESSOR Approved TO: CDRC Office
Subdivision Review
City of Tucson

FROM: Julieann Arechederra
GIS Cartographer
Pima County Assessor's Office

DATE: July 19, 2022

RE: Assessor's Review and Comments Regarding:
RESERVE AT VALENCIA CROSSING S22-044

X Plat meets Assessor's Office requirements.
08/04/2022 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Email from: TEP-DEVREV <TEPDEVREV@tep.com>
To: CDRC
Tue 8/2/2022 1:27 PM

Tucson Electric Power Co. (TEP) has reviewed and has no objection to the Reserve, 1st Submittal Review: S22-044 Plat submitted on July 15, 2022.

TEP is in the process of preparing a Preliminary Electrical design for this project. A final construction drawing will be prepared when the preliminary design is approved by the customer and TEP has received a copy of the Approved Tentative Plat.
Thank you,

Tucson Electric Power Co.
Land Resources Department
08/08/2022 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved View in the DOCUMENTS section of PRO: "Tucson Airport Authority, letter of approval, 08.01.22"
08/08/2022 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change View in the DOCUMENTS section: "Pima Co Addressing, review comments, first submittal, 08.03.22"
08/30/2022 SBLOOD1 ENGINEERING REVIEW Reqs Change 1. Add in the case number S22-044 on the final plat and in the assurance agreement.
2. Fill in the sequence number for the release of the 20' utility easement being abandoned.
3. Fill in the legal description on the assurance agreement under Exhibit A.
4. Under schedule B of the title report numbers 2 and 3 call out an easement for pipeline and incidental purposes recorded in Bk 51, Pg 301 and an easement for communication facilities and incidental purposes recorded in Bk 102, Pg 352. These are not showing up on the final plat, either show them or explain why they are not applicable.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
08/31/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change email from: COTDSDPermits
To: Steven Vasquez
08/31/2022

REVIEW NOTICE

Returned for Corrections: S22-044
Final Plat - The Reserve at Valencia Crossing.
5251 E LITTLETOWN RD

Fee Balance: $0 (zero) Thank you for the payment.

YOUR NEXT STEPS
1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter

3. UPLOAD documents to Filedrop:
- Comment Response Letter (your response to REQUIRES CHANGE comments)
- Plan Set (all pages, full set, even if no changes were made)
- Documents requested by review staff

FILEDROP
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- "Existing Application"
- "Permit Number" field: enter the number (and any notes for our staff)


Sharon Beasley, Certified Permit Technician

City of Tucson, Planning & Development Services Dept.
Email: COTDSDpermits@TucsonAz.gov
(for development packages, land splits, Thursday Presubmittal meetings)
Email: PDSDinquiries@TucsonAz.gov
(for building permits)