Plan Review Detail
Review Status: Completed
Review Details: LOT SPLIT REVIEW
Plan Number - S22-031
Review Name: LOT SPLIT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/25/2022 | SBEASLE1 | START | PLANS BEING WALKED THRU | Completed | |
| 05/25/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 1132 N 6th Ave – C-2 S22-031 Land Split (1st Review) TRANSMITTAL DATE: May 25, 2022 SECTION 2-08.0.0: LAND SPLIT 2-08.2.0 CONTENT REQUIREMENTS 1. COMMENT: 2-08.3.7 – Provide Metes and Bounds legal descriptions for both proposed parcels with the next submittal. 2. COMMENT: 2-08.5.E – Provide the perimeter yard setbacks from the proposed property line to the existing house and to the accessory structure. Per UDC TABLE 6.3-4.A: DIMENSIONAL STANDARDS FOR THE C-1, C-2, C-3, OCR-1, & OCR-2 ZONES, C-2 Zone, Residential Use to a Nonresidential Zone the required perimeter yard setback is 10’ or ¾ (H) = Height of the proposed exterior building wall, greater of the two. Also, provide the heights of the exterior walls for both structures so that setbacks can be verified. Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. 3. COMMENT: 2-08.5.H – Demonstrate how legal access will be provided to both parcels. If alley access is proposed demonstrate how the requirements of UDC Article 7.4.6.K.A2 are met. If access for Parcel A will be provided from the alley some type of easement is required. 4. COMMENT: - As this is not plat remove the references to DIDICATION, APPROVAL, ASSURANCES, etc. from the plan. If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. |
| 05/26/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Each occupiable building shall have an independent connection to the public sewer. Show how access to the public sewer will be provided for parcel B. Reference: Section 701.3, IPC 2018. 2. For the purposes of having a water meter, a parcel is required to have a minimum width of 15-feet of frontage on a water main. An easement is not considered to be frontage. Show how parcel B will be provided with a water meter. Reference: Tucson Water Remote Meter Policy, Number IV-B.08, dated 07/14/2009. |
| 05/30/2022 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Reqs Change | 1. General: Indicate how access to each parcel is achieved. |
| 06/15/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Show vehicle access locations for both proposed parcels. 2. Show vehicle use areas for parcel A. 3. Clearly identify the use of each existing building. Loren Makus loren.makus@tucsonaz.gov |
| 06/22/2022 | SBEASLE1 | ZONING-RECORDATION | REVIEW | Reqs Change | Email sent from: COTDSDPermits To: Jeff Stephens Wed 6/22/2022 4:18 PM LAND SPLIT PLAN Returned for Corrections: S22-031 Project Description: Land Split - Phillips Subdivision. Divide one parcel into two parcels. 1132 N 6TH AV Fee Balance: $0 (zero) Thank you for the payment. View the review comments and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW YOUR NEXT STEPS Submit the following items to the FILEDROP 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Survey or Exhibit (even if no changes were made) 3) Legal Descriptions 4) Any other items requested by reviewers FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp Select "Existing Application", then in the "Permit Number" field, enter your number and any notes you want directed to the City staff Thank you. Sharon Beasley, Certified Permit Technician, CPT City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for land splits, development packages, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |
| 06/22/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | Email from: Ray Munoz To: CDRC Wed 6/22/2022 9:00 AM Tucson Water approves this lot split. Parcel B will require a main extension to get service. Thank you, Ray Munoz City of Tucson |