Plan Review Detail
Review Status: Completed
Review Details: LOT SPLIT REVIEW
Plan Number - S22-020
Review Name: LOT SPLIT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/06/2022 | SBEASLE1 | START | PLANS BEING WALKED THRU | Completed | |
| 04/07/2022 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Completed | |
| 04/12/2022 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | If the two buildings are currently using a single connection to the public sewer and will continue to do so, a recorded Joint Sewer User Agreement will be required. The alternative would be to add a second connection to the public sewer. |
| 04/13/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 25 W. President St S22-020 Land Split (1st Review) TRANSMITTAL DATE: April 13, 2022 SECTION 2-08.0.0: LAND SPLIT 2-08.2.0 CONTENT REQUIREMENTS 1. COMMENT: 2-08.5.B – The distance, 41.03’, shown on the plan for the south property line of Lot 2 does not match the distance, 48.53 shown in the legal description. 2. COMMENT: 2-08.5.D – For the Exclusive Parking Ease it does not appear that the distance for the north distance, 38.53 is correct. 3. COMMENT: 2-08.5.F – Perimeter yard setbacks are based on a measurement from design grade to the highest point of the exterior wall UDC Article 6.4.5.B & Figure 6.4.5-A. Provide the height of the building walls on Lot 1 along the east property line so that Zoning can verify perimeter yard setback requirements. Based on the setbacks shown the required perimeter yard setbacks, is the greater of six (6) feet, or two-thirds (2/3) the height of the structure’s wall facing each interior property line (Table 6.3-2.A) the proposed land split reduces the required setback below the minimum of 6’-0” a Design Development Option (DDO) must be submitted and approved to reduce the required setback, DDO application and requirements can be found at: https://www.tucsonaz.gov/files/pdsd/forms/DDO_for_Setback_and_Height_UDC_8.11.20.pdf. A DDO is a separate submittal from the building plan and shall be submitted at: https://www.tucsonaz.gov/pdsd-filedrop, using the Submission Type “Zoning Administration”. If you have questions about the DDO application or process please contact Mark Castro at Mark.Castro@tucsonaz.gov. 4. COMMENT: Provide a lot coverage calculation for both lots that meets the requirements of UDC Article 6.4.3 and the example shown on the Residential Plot Plan Requirements found at: https://www.tucsonaz.gov/files/pdsd/forms/Residential_Plot_Plan_Requirements.pdf, If you have any questions about this transmittal, please contact Nicholas Ross at Nicholas.Ross@tucsonaz.gov. |
| 06/14/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 06/15/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | Email from: Ray Munoz To: CDRC Tue 6/14/2022 3:33 PM Tucson Water approves this lot split Thank you, Ray Munoz City of Tucson |
| 06/15/2022 | SBEASLE1 | ZONING-RECORDATION | REVIEW | Reqs Change | Email from: COTDSDPermits To: James M. Piele Wed 6/15/2022 11:49 AM REVIEW NOTICE Returned for Corrections: S22-020 Project Description: Land Split - Divide one lot into two lots. 25 and 31 W. President Street. Fee Balance: $0 (zero) Thank you for the payment. YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 3. UPLOAD A RESUBMITTAL to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Legal Desciptions - Survey - Any other documents requested by review staff - FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Thank you. Sharon Beasley, Certified Building Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits and all other subjects) |