Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S22-015
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/04/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
04/04/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
04/04/2022 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
04/04/2022 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Pima County Wastewater at email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
04/05/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL FROM: PDSD Zoning Review PROJECT: Pantano Vista, Lots 1-32 FINAL PLAT (1st Review) S22-015 TRANSMITTAL DATE: April 5, 2022 DUE DATE: April 18, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 2-07.5.0 CONTENT REQUIREMENTS 2-07.5.1 General 1. COMMENT: 2-07.5.1.H – Provide the subdivision case number, S22-015, in the lower right corner of the plat next to the title block on all sheets. 2-07.5.2 General Notes The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information. 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2. COMMENT: 2-07.5.3.D – The City Clerks name listed in the APPROVAL paragraph is not correct and should be “SUZANNE MESICH”. 3. COMMENT: 2-07.5.6 – Provide a copy of the CC&R’s with your next submittal. If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp |
04/13/2022 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | TO: CDRC Office Subdivision Review City of Tucson FROM: Julieann Arechederra GIS Cartographer, Pima County Assessor's Office DATE: April 8, 2022 RE: Assessor's Review and Comments Regarding: PANTANO VISTA S22-015 ___X___ Plat does not meet Assessor's Office requirements. COMMENTS: " THERE MUST BE BEARINGS AND DIMENSIONS FOR THE PERIMETER AND ALL LOT LINES AND ALL COMMON AREAS. NEED SQUARE FOOTAGE FOR COMMON AREA "A". " ALL ADJACENT SUBDIVISIONS SHOULD BE NAMED, WITH MAP AND PLAT IN THE APPROPRIATE AREAS AROUND THE SUBDIVISION. |
06/22/2022 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Email from: TEP-DEVREV <TEPDEVREV@tep.com> To: CDRC Tue 6/21/2022 7:42 AM Tucson Electric Power Co. (TEP) has reviewed the plans submitted on April 4th, 2022, and has no objections. Please note that TEP is awaiting customer approval of the Preliminary Construction Design submitted to Sierra Land Surveying & Development Services on March 1st, 2022. Customer approval and a copy of the Approved Plat are required for TEP to prepare a final Construction Drawing. Easements are required for TEP facilities if not appropriately recorded on the final subdivision plat. They will need to be obtained by separate instrument. Tucson Electric Power Co. Land Resources Department |
06/24/2022 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | Email from: Nicholas Jordan <Nicholas.Jordan@pima.gov> To: CDRC Thu 6/23/2022 12:43 PM Pima County Addressing approves S22-015 Final Plat - Pantano Vista Lots 1-32. Thank you Nicholas Jordan Site Review Project Manager - Addressing Official |
07/05/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Provide the correct name of the City Clerk: Suzanne Mesich. 2. Add dedication statements describing the streets and common areas and their purposes. AM 2-07.5.3 3. The dedication statements also must describe easements created by this plat and their purpose. 4. In your response letter, explain the assurances mechanism for the subdivision. Provide applicable notes on the plat, if required. 5. Provide a draft of the CC&Rs addressing maintenance of the common areas. 6. The dedication statements should reference the CC&Rs and the recordation data for them. Loren Makus loren.makus@tucsonaz.gov |
07/06/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: Jeffrey Stanley Wed 7/6/2022 1:08 PM REVIEW NOTICE Returned for Corrections: S22-015 Project Description: Final Plat - Pantano Vista, Lots 1 thru 32. 8315 E GOLF LINKS RD Fee Balance: $0 (zero) Thank you for the payment. YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter 3. UPLOAD A RESUBMITTAL to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Any other documents requested by review staff FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Thank you. Sharon Beasley, Certified Building Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits) |