Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S22-014
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/07/2022 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
04/07/2022 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
04/07/2022 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
04/07/2022 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | To: Applicant From: Planning & Development Services Dept. Contact Pima County Wastewater at email: Sewer@Pima.gov, or phone 520-724-6500 to request their approval. Submit the approval letter to the City of Tucson with your next submittal. It is required before the final step of Mayor and Council's approval of the FINAL PLAT. |
04/13/2022 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PROJECT: Irvington & I-19 Commercial Center Lots 38-46, 48-51 + block ‘F’ FINAL PLAT (1st Review) S22-014 TRANSMITTAL DATE: April 13, 2022 DUE DATE: April 19, 2022 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 2-07.5.0 CONTENT REQUIREMENTS 2-07.5.1 General 1. COMMMENT: 2-07.5.1.H - The subdivision case number, S22-014, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets. 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2. COMMMENT: 2-07.5.3.D. The City Clerk’s name is not correct within the Approval block is not correct and should be Suzanne Mesich. If you have any questions about this transmittal, please contact Nicholas Ross at Nocholas.Ross@tucsonaz.gov. To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp |
04/13/2022 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Approved. The letter can be viewed in the "Documents" section of PRO: "Pima Co Assessor, Letter of Approval, 04.08.22" |
04/22/2022 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Approved. See the Documents section of PRO for the following: TEP Facilities Map, and TEP Letter of Approval 04.22.2022 |
06/01/2022 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | Email from: Nicholas Jordan <Nicholas.Jordan@pima.gov> To: CDRC Tue 5/31/2022 11:44 AM Pima County Addressing approves S22-014 FP for Irvington and I-19 Commercial Center Lots 38-46 and 48-51. Nicholas Jordan Site Review Project Manager - Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
06/08/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
06/13/2022 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits to: lisa bowers Mon 6/13/2022 9:23 AM REVIEW NOTICE Returned for Corrections: S22-014 Project Description: Final Plat - Irvington and I-19 Commercial Center Fee Balance: $0 (zero) YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter 3. UPLOAD A RESUBMITTAL to Filedrop: - Comment Response Letter (your response to REQUIRES CHANGE comments) - Plan Set (all pages, full set, even if no changes were made) - Any other documents requested by review staff - FILEDROP https://docs.tucsonaz.gov/Forms/tucsonpermitapp - "Existing Application" - "Permit Number" field: enter the number (and any notes for our staff) - Select "PLANS" for all documents Sharon Beasley, Certified Building Technician City of Tucson, Planning & Development Services Dept. Email: COTDSDpermits@TucsonAz.gov (for development packages, land splits, Thursday Presubmittal meetings) Email: PDSDinquiries@TucsonAz.gov (for building permits and all other subjects) |