Plan Number: S22-003
Parcel: Unknown

Address:
735 E WETMORE RD

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S22-003
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/14/2022 SBEASLE1 START PLANS SUBMITTED Completed
02/14/2022 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
02/14/2022 SBEASLE1 PIMA COUNTY WASTEWATER Passed See the document in the "Documents" section of PRO titled: "Pima Co Wastewater, review not required, 03.07.22 email"
02/14/2022 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed
02/14/2022 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed
02/15/2022 ED ABRIGO PIMA COUNTY ASSESSOR Approved (This letter can be viewed in the "Documents" section of PRO: "Pima Co Assessors approval letter, 02.14.22")

Approved. Plat meets Assessor’s Office requirements.
02/23/2022 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Completed
03/02/2022 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved Email from: TEP-DEVREV <TEPDEVREV@tep.com>
To: CDRC
Wed 3/2/2022 11:11 AM

Tucson Electric Power Co., (TEP) has reviewed and has no objection to Riverfront Village, 1szt submittal review: S22-003, submitted on February 14th, 2022.

There are existing TEP facilities within the boundaries of the plat. Costs for removing or relocating existing TEP facilities will be billable to the developer.

Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development.

If easements are required for new TEP facilities, they will be obtained by separate instrument.

If there are any questions, please contact Land Resources at tepdevrev@tep.com.

Tucson Electric Power Co., Land Resources Department
03/08/2022 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: Riverfront Village Blocks 1-3
FINAL PLAT (1st Review)
S22-003

TRANSMITTAL DATE: March 8, 2022

DUE DATE: March 3, 2022

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
2-07.5.0 CONTENT REQUIREMENTS
2-07.5.1 General
2-07.5.1.A.4 - Show the city’s jurisdictional limits on the location map.
2-07.5.1.H - The subdivision case number, S22-003, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets.
Provide the following information on the plat:
2-07.5.4.A – Some type of cross access/parking agreement or easement is required. Provide a copy of the recorded document with the next submittal.
If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.
To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp
03/09/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved The approval letter is viewable in the Documents section of PRO: "2_Tucson Water availability letter, 03.07.22"
03/10/2022 JIM EGAN COT NON-DSD FIRE Approved
03/11/2022 JOSE ORTIZ COT NON-DSD TRAFFIC Approved Email from: David Stiffey
To: CDRC
Fri 3/11/2022 9:04 AM

Approved. No comments.

David Stiffey
City of Tucson
04/25/2022 AWARNER1 LANDSCAPE REVIEW Passed
04/25/2022 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved Email from: Howard Dutt
To: CDRC
Mon 4/25/2022 11:04 AM

No existing or proposed Tucson Parks and Recreation facilities are affected by this Block Plat.

Howard Dutt, RLA
Project Manager/Landscape Architect
Parks and Recreation | City of Tucson
05/04/2022 KAY MARKS PIMA COUNTY ADDRESSING Reqs Change See the "Documents" section of PRO for document titled:
"Pima Co Addressing, review comments, first submittal, 05.04.22"
05/09/2022 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Revise the signature line in the Assurances block from "City of Tucson Planning & Development Services Department Engineering Administrator" to "City Engineer."
2. Update the name of the City Clerk to "Suzanne Mesich."

Loren Makus
loren.makus@tucsonaz.gov
05/10/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: Jean Armstrong
Tue 5/10/2022 5:02 PM

REVIEW NOTICE
Returned for Corrections: S22-003

DESCRIPTION: Block Plat - Riverfront Village, Blocks 1-3. Split one lot into three lots. Three existing buildings to remain. 735 E WETMORE RD

Fee Balance: $0 (zero) Thank you for the payment.

YOUR NEXT STEPS
1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

2. Title your SECOND submittal documents accordingly, example: 2_Comment Response Letter

3. UPLOAD A RESUBMITTAL to Filedrop:
- Comment Response Letter (your response to REQUIRES CHANGE comments)
- Plan Set (all pages, full set, even if no changes were made)
- Any other documents requested by review staff

- FILEDROP:
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- "Existing Application"
- "Permit Number" field: enter the number (and any notes for our staff)
- Select "PLANS" for all documents

Thank you.
Sharon Beasley, Certified Permit Specialist

City of Tucson, Planning and Development Services
Email: COTDSDpermits@TucsonAz.gov