Plan Number: S21-082
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S21-082
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/02/2022 SBEASLE1 START PLANS SUBMITTED Completed
03/02/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved Approved.
The approval letter is viewable in the Documents section of PRO: "2g_WA3807, Tucson Water availability letter, 11.16.21"
03/03/2022 SBEASLE1 ENGINEERING REVIEW Approved Approved.
The names of the Pima County Recorder and the City Clerk have been corrected on the Final Plat.

Sharon Beasley, Certified Permit Technician, CPT
City of Tucson
email: COTDSDpermits@TucsonAz.gov
03/03/2022 SBEASLE1 PIMA COUNTY WASTEWATER Approved Approved.
The approval letter can be viewed in the "Documents" section of PRO: "Pima Co Wastewater, approval letter, 12.03.21"
03/08/2022 ED ABRIGO PIMA COUNTY ASSESSOR Approved (The letter can be viewed in the "Documents" section of PRO: "Pima Co Assessors approval letter, 03.07.22")

Approved. Plat meets Assessor’s Office requirements.
03/21/2022 STEVE SHIELDS ZONING REVIEW Approved
03/22/2022 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Email from: TEP-DEVREV <TEPDEVREV@tep.com>
To: CDRC
Tue 3/22/2022 12:28 PM

Tucson Electric Power Co. (TEP) TEP has reviewed plans received March 2nd, 2022, and has no objections for Alta Linda subdivision. Costs for removing or relocating existing TEP facilities will be billable to the developer. A Preliminary electrical design is in process. The customer is responsible for compliance with City Ordinances. Please note jurisdictional permit for any work on a public road right of way where applicable. Easements are required for TEP facilities if not appropriately recorded on the final subdivision plat. They will need to be obtained by separate instrument.

Tucson Electric Power Co.
Land Resources Department
04/15/2022 SBEASLE1 PIMA COUNTY ADDRESSING Approved Email from: Nicholas Jordan <Nicholas.Jordan@pima.gov>
To: CDRC
Thu 4/14/2022 4:02 PM

Pima County Addressing approves S21-082 Alta Linda at Starr Pass Lots 1-20.
Thank you

Nicholas Jordan
Site Review Project Manager - Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
04/28/2022 SAMUEL ROGERS ZONING-DECISION LETTER REVIEW Reqs Change April 19, 2022
Rick Engineering Company
Attn: Chuck Martin
3845 E Ft. Lowell Rd #111
Tucson, AZ 85712

Subject: Final Plat for (S21-082) Alta Linda At Starr Pass Lots 1-20

The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit five (6) weeks in advance to the next available Mayor & Council meeting, June 7th, 2022. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 3rd floor lobby drop box for us to obtain City staff's signatures:


1. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank.

2. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid.

3. Check or money order made payable to "Pima County Recorder" in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder's Office at 520-740-4350. Check must be pre-printed with name and address and dated within 60 days of the scheduled Mayor & Council meeting.

4. Original set of executed and notarized CC&R (if applicable).

5. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement.

6. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk's Office one (1) week prior to and following Mayor & Council meeting.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney's Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk's Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.

Should you have questions, contact Iman Monshizadeh at (520) 837-4082 or Iman.Monshizadeh@tucsonaz.gov.

xc: Project Record by Activity Number