Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S21-077
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S21-077
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/11/2022 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Revise general note 15 on sheet 1 to reflect Pima County instead of Pinal County.
2. Revise the name of the Pima County Recorder to Gabriella Cázares-Kelly, the current recorder.
3. Provide the case number (DP) of the tentative plat on each sheet near the title block.
Loren Makus
loren.makus@tucsonaz.gov
01/12/2022 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: Andie Hemmah
Wed 1/12/2022 11:36 AM

REVIEW NOTICE
Returned for Corrections: S21-077

DESCRIPTION: Final Plat - La Estancia de Tucson, Phase 2, Parcel 8. Lots 1 thru 85, and Common Areas A-8 and B-8 (landscape, open space, drainage, easement).
6670 E CAMINO BOLEADORAS

Fee Balance: $0 (zero) Thank you for the payment.

YOUR NEXT STEPS
1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab to see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

2. UPLOAD A RESUBMITTAL and include:
1) Comment Response Letter (your response to REQUIRES CHANGE comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your SECOND submittal documents according to this example: 2_Comment Response Letter

FILEDROP for your Resubmittal
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- Select "Existing Application"
- In the "Permit Number" field, enter the number and, if applicable, any notes for our staff


Thank you.
Sharon Beasley, Building Permit Specialist

City of Tucson, Planning and Development Services
Email: COTDSDpermits@TucsonAz.gov
02/11/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved The approval letter is viewable in the Documents section of PRO: "S21-077, Tucson Water availability letter, 03.01.2021".
10/29/2021 SBEASLE1 START PLANS SUBMITTED Completed
10/29/2021 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
10/29/2021 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change To: Applicant
From: Planning & Development Services Dept.

Please contact Pima County Wastewater (email: Sewer@Pima.gov, phone 520-724-6500) and request approval. Include the approval document in your next submittal. This is required before the last step of Mayor and Council's approval of the Final Plat.
11/03/2021 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change (This letter can be viewed in the "Documents" section of PRO: "Pima Co Assessors, review comments, first submittal")

FROM: Ada Janson, GIS Cartographer
Pima County Assessor's Office
DATE: November 1, 2021
RE: Assessor's Review and Comments Regarding:
S21-077 1ST SUBMITTAL FINAL PLAT LA ESTANCIA DE TUCSON PHASE 2, PARCEL 8, LOTS 001-085, C.A. A8 & B8
___X___ Plat does not meet Assessor's Office requirements.

COMMENTS:
" THE TITLE BLOCK MUST BE IN THE LOWER RIGHTHAND CORNER, MUST MENTION THE PLAT NAME AND THE MAP AND PLAT, IF IT IS A RESUBDIVISION.

" ALL ADJACENT SUBDIVISIONS SHOULD BE NAMED, WITH MAP AND PLAT IN THE APPROPRIATE AREAS AROUND THE SUBDIVISION.

" OWNERSHIP OF PARCEL 141-36-6870 IS SHOWING IN THE NAME OF CITY OF TUCSON.
11/08/2021 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT: La Estancia Dl Tucson – Phase 2, Parcel 8, Lots 1 -85
FINAL PLAT (1st Review)
S21-077

TRANSMITTAL DATE: November 8, 2021

DUE DATE: November 12, 2021

COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

2-07.1.0 APPLICABILITY
Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.”
A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site.
2-07.4.0 FORMAT REQUIREMENTS
2-07.5.0 CONTENT REQUIREMENTS
1. COMMENT: 2-07.5.1.H – Provide the subdivision case number, S21-077, and the tentative plat case number, DP21-0259, in the lower right corner of the plat next to the title block on all sheets.

2. COMMENT: General Noted 8 states that “THE LAND USE DESIGNATION FOR THIS PLAT IS LDR OF THE LA ESTANCIA SPECIFIC PLAN” but this plat is located within the “MDR” area of the pad.

3. COMMENT: Tentative plat, DP21-0259 must be approved prior to approval of this plat.
If you have any questions about this transmittal, please contact Elisa Hamblin at Elisa.Hamblin@tucsonaz.gov.

To resubmit your plans for additional review, please visit: https://docs.tucsonaz.gov/Forms/tucsonpermitapp

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised development package
11/12/2021 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved (This letter can be viewed as a PDF. See the "Documents" section of PRO: "TAA approval letter, 11.10.21")

Thank you for the opportunity to comment on S21-077 / Final Plat - La Estancia de Tucson, Phase 2, Parcel 8. Lots 1 thru 85, and Common Areas A-8 and B-8 (landscape, open space,
drainage, easement); 1st Submittal, a development package application for a final plat of a
16.164 acre site, located southeast of the intersection of South Wilmot Road and East Camino
Boledoras. The property is zoned Planned Area Development 7 (PAD-7) and this project
proposes to plat existing parcels of land for a new single family residential development.

This site is within the Tucson International Airport avigation easement requirements and public
disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

The Tucson Airport Authority is satisfied with the 1st submittal of this project and has no additional comments to provide.

Please do not hesitate to contact me if you have any questions or concerns regarding this
comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.

Respectfully,
Scott Robidoux, C.M.
Manager of Planning
11/17/2021 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The ATTACHED PDF mentioned below can be viewed in the "Documents" section of PRO: "Pima Co Addressing, review comments, first submittal, 11.12.21")

Email from: <Addressing@pima.gov>
To: CDRC
Fri 11/12/2021 12:46 PM

( PARCEL # 8 ) La Estancia, Final Plat, 1st submittal, S21-077, is being Returned for Corrections by Pima County Addressing.

The attached pdf contains Addressing’s comments. Let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
12/01/2021 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Email from: TEP-DEVREV <TEPDEVREV@tep.com>
To: CDRC
Tue 11/30/2021 5:03 PM

Tucson Electric Power Co. (TEP) has reviewed the plans submitted on October 29th , 2021, and has no objections at this time.

The customer is responsible for compliance with City Ordinances. Please note jurisdictional permit for any work on a public road right of way is required. Easements are required for TEP facilities if not appropriately recorded on the final subdivision plat. They will need to be obtained by separate instrument. Please contact tepdevrev@tep.com for any easement questions.

Tucson Electric Power Co.
Land Resources Department
Attn: Renee or Diane