Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S21-072
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
10/15/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
10/15/2021 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
10/15/2021 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | To: Applicant From: Planning & Development Svcs. Dept. Please contact Pima County Wastewater at email: Sewer@Pima.gov or phone (520) 724-6500 to request their approval for wastewater. Submit their approval letter to the City of Tucson with your next submittal. |
10/15/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | To: Applicant From: Planning & Development Services Dept. Please contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. This is required before the last step of Mayor and Council's approval of the Block Plat. |
10/15/2021 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | |
10/15/2021 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | |
10/18/2021 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | Email from: TEPDEVREV@tep.com To: CDRC Mon 10/18/2021 12:29 PM Tucson Electric Power Co. (TEP) has reviewed the plans submitted on October 15th, 2021, and has no objections at this time. The customer is responsible for compliance with City Ordinances. Would you please call the New Construction Department at 520-918-8300 to apply for service? Submit a final set of approved plans, including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument. Removal or relocation of existing TEP facilities will be at the Developer's expense. Don't hesitate to get in touch with me at tepdevrev@tep.com should you have any questions. Tucson Electric Power Co. Land Resources Department Attn: Courtney Tejeda |
10/27/2021 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Reqs Change | Each occupiable building shall have an independent connection to the public sewer. Show how access to the public sewer will be provided for lots 1 and 2. Reference: Section 701.3, IPC 2018. |
10/28/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL FROM: PDSD Zoning Review PROJECT: 6350 S 6th Ave FINAL PLAT (1st Review) S21-072 TRANSMITTAL DATE: October 28, 2021 DUE DATE: November 02, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 2-07.4.0 FORMAT REQUIREMENTS 2-07.4.3 – Provide a two-inch margin on the left side of the plat to comply with standardization requirements of state law for recorded plats 2-07.5.0 CONTENT REQUIREMENTS 2-07.5.1 General 2-07.5.1.A.2 - Label the section corners on the location map. 2-07.5.1.A.3 – Label all subdivisions on the location map. 2-07.5.1.A.4. The city’s jurisdictional limits, if within the mapped area. 2-07.5.1.D - Place the words “SEQ#________” in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder’s Office at the time of recordation. 2-07.5.1.E. Provide a title block in the lower right corner of each sheet with the following information: 2-07.5.1.E.1- Provide the number of proposed lots within the title block. As you are creating a total of 4 lots it should read “LOTS 1-4”. Provide a lot number for the proposed large lot. 2-07.5.1.H - The subdivision case number, S20-72, assigned to this plat must be placed in the lower right corner of the plat next to the title block on all sheets. 2-07.5.2 General Notes The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information. 2-07.5.2.B - “The total number of lots is 4.” 2-07.5.2.C - “Total miles of new private streets are ____.” 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2-07.5.3.D. Provide the Approval and Recording Data Blocks as shown in AM 2-07. If you have any questions about this transmittal, please contact Elisa Hamblin or Elisa.Hamblin@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Final Plat |
11/02/2021 | SBEASLE1 | COT NON-DSD | PARKS & RECREATION | Approved | email from: Howard Dutt to: CDRC Tue 11/2/2021 10:33 AM No existing or proposed Tucson Parks and Recreation facilities are affected by this development. Howard B. Dutt, RLA Landscape Architect Tucson Parks and Recreation (520) 631-2030 |
11/04/2021 | AWARNER1 | LANDSCAPE | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Planning and Development Services Department, Plans Coordination FROM: Anne Warner, RLA PDSD Landscape/NPPO Review PROJECT: Minor Subdivision ACTIVITY NO. S21-072 TRANSMITTAL DATE: November 4, 2021 Add to General Notes An approved Native Plant Preservation Plan Sections 7.7.4 is required or a request for an exception from the Native Plant Preservation requirements in accordance with Sections 7.7.3.D.3 & .4 of the Unified Development Code (UDC) and Admin. Manual Section 2-11.0.0 is required prior to Grading Plan approval for each lot. If you have any questions about this transmittal, contact Anne Warner at email anne.warner@tucsonaz.gov |
11/09/2021 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
11/17/2021 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | Email from: David Stiffey To: CDRC Wed 11/17/2021 1:56 PM No comments |
11/30/2021 | KAY MARKS | PIMA COUNTY | ADDRESSING | Needs Review | Email from: <Addressing@pima.gov> To: CDRC Tue 11/30/2021 8:55 AM This project has an outstanding balance for review fees. Review will be scheduled after the fees are paid by the applicant. Thank you Nicholas Jordan, Addressing Specialist Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
12/02/2021 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | FROM: Janice Wagner, GIS Cartographer Pima County Assessor's Office DATE: November 30, 2021 RE: Assessor's Review and Comments Regarding: S21-072 / RESUBDIVISION OF LOT 5 & A PORTION OF LOT 4,BLK 7 MISSIONDALE SUBDIVISION IN 04/041 M&P./S21/072 /FIRST FINAL REVIEW X Plat meets Assessor's Office requirements. |
12/29/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Provide a tie to a section corner or quarter corner. Clearly label the corner. 2. The water adequacy statement doesn't require a signature line. Please remove it. 3. Provide the recordation statement as required by AM 2-07.5.3.D. Loren Makus loren.makus@tucsonaz.gov |
12/31/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: Jose Quintero Fri 12/31/2021 2:57 PM REVIEW NOTICE Returned for Corrections: S21-072 DESCRIPTION: Block Plat - Missiondale, Lots 1,2,3. 6350 S 6TH AV FEE BALANCE: $ 1,116.50 Please pay at a minimum, the REVIEW category fees. A payment is required before your next submittal. ONLINE PAYMENT If amount doesn't match "Fees Due", check back in a few hours https://www.tucsonaz.gov/pdsd/fees 1- Click on: Pay Planning & Permit Fees 2- Enter Permit Nbr, example: dp20-0000 (not case-sensitive but a hyphen-dash- is needed) 3- Business/Individual Name: Leave this field blank 4- "Continue" 5- In the Pay column - check the boxes 6- "Continue" YOUR NEXT STEPS 1. SEE REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab to see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW 2. UPLOAD A RESUBMITTAL and include: 1) Comment Response Letter (your response to REQUIRES CHANGE comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your SECOND submittal documents according to this example: 2_Comment Response Letter FILEDROP for your Resubmittal https://docs.tucsonaz.gov/Forms/tucsonpermitapp - Select "Existing Application" - In the "Permit Number" field, enter the number and, if applicable, any notes for our staff Thank you. Sharon Beasley, Building Permit Specialist City of Tucson, Planning and Development Services Email: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) |