Plan Number: S21-069
Parcel: Unknown

Address:
7215 S KOLB RD

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S21-069
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/27/2021 SBEASLE1 START PLANS SUBMITTED Completed
10/27/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved (See this approval letter in the Documents section of PRO, with title"2_Water Availability Letter, S21-069, Tucson Water")

October 22, 2021

SUBJECT: Water Availability for Project: SE Kolb Rd. and Century Park Dr., APN: 141-07-0340,
Case#: WA3781, T-15 R-15 S-17, Lots: 9999, Location Code: TUC, Total Area: 33.58,
Zoning: PAD-26, SP.

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for
demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject
project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not limited
to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the
developer. If the existing water system is not capable of meeting the requirements of the proposed development,
the developer -03shall be financially responsible for modifying or enhancing the existing water system to meet
those needs. This letter shall be null and void two years from the date of issuance.

Issuance of this letter is not to be construed as agency approval of a water plan or as containing
construction review comments relative to conflicts with existing water lines and the proposed development.

If you have any questions, please call New Development at 791-4718.

Sincerely,
Michael Mourreale, Engineering Manager
Tucson Water New Development
10/27/2021 SBEASLE1 PIMA COUNTY WASTEWATER Passed (See this in Documents section of PRO, with title "2_PC Wastewater email, S21-069, no review required")

From: Sewer <Sewer@pima.gov>
Sent: Friday, October 22, 2021 3:13 PM
To: Kevin Letendre; Sewer
Subject: RE: S21-069 - Final Plat - PCRWRD approval

Kevin,
Pima County DSD and RWRD has no interest on reviewing this Final plat because there is no existing nor proposed sewer within the project scope.

Hussein Al Zubaidi, P.E., Site Review Project Manager
Pima County Development Service Department
201 N. Stone Ave., 1st Floor, Tucson, AZ 85701
(520) 724-6404
10/28/2021 NICHOLAS ROSS ZONING REVIEW Approved
11/01/2021 JOSE ORTIZ COT NON-DSD TRAFFIC Approved Email from: David Stiffey
To: CDRC
Mon 11/22/2021 7:49 AM

No Comments

David Stiffey
City of Tucson
Transportation and Mobility
11/01/2021 SBLOOD1 ENGINEERING REVIEW Approved
11/01/2021 ED ABRIGO PIMA COUNTY ASSESSOR Approved (See the Documents section of PRO to view this approval letter)

TO: CDRC Office, Subdivision Review
City of Tucson
FROM: Ada Janson, GIS Cartographer
Pima County Assessor's Office
DATE: October 29, 2021

RE: Assessor's Review and Comments Regarding:
S21-069 2nd SUBMITTAL FINAL PLAT CENTURY PARK RESEARCH CENTER PHASE III

X Plat meets Assessor's Office requirements.

THANK YOU FOR YOUR SUBMITTAL
11/05/2021 SAMUEL ROGERS ZONING-DECISION LETTER REVIEW Reqs Change November 5, 2021
Psomas
Attn: Kevin Letendre
333 E Wetmore Rd.
Tucson, AZ 85705

Subject: Final Plat for (S21-069) Century Park Research Center, Phase III, Blocks 18 and 18

The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit five (5) weeks in advance to the next available Mayor & Council meeting, December 7, 2021. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 3rd floor lobby drop box for us to obtain City staff's signatures:

1. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank.

2. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid.

3. Check or money order made payable to "Pima County Recorder" in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder's Office at 520-740-4350. Check must be pre-printed with name and address and dated within 60 days of the scheduled Mayor & Council meeting.

4. Original set of executed and notarized CC&R (if applicable).

5. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement.

6. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk's Office one (1) week prior to and following Mayor & Council meeting.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney's Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk's Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.

Should you have questions, contact Samuel Rogers at (520) 837-6932 or Samuel.Rogers@tucsonaz.gov.

xc: Project Record by Activity Number
11/05/2021 KAY MARKS PIMA COUNTY ADDRESSING Approved Email from: <Addressing@pima.gov>
To: CDRC
Mon 11/22/2021 12:18 PM

CENTURY PARK 2nd submittal, S21-069 is Approved by Pima County Addressing.

Thank you,
Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570