Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S21-052
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/01/2022 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
02/10/2022 | SAMUEL ROGERS | ZONING-DECISION LETTER | REVIEW | Approv-Cond | February 11, 2022 Kimley-Horn Attn: Erin Harris 333 E. Wetmore, Suite 280 Tucson, AZ 85705 Subject: Final Plat for (S21-052) Golf Links and Kolb Lots 1-8 The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit six (6) weeks in advance to the next available Mayor & Council meeting, April 5, 2022. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 3rd floor lobby drop box for us to obtain City staff's signatures: 1. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank. 2. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid. 3. Check or money order made payable to "Pima County Recorder" in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder's Office at 520-740-4350. Check must be pre-printed with name and address and dated within 60 days of the scheduled Mayor & Council meeting. 4. Original set of executed and notarized CC&R (if applicable). 5. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement. 6. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk's Office one (1) week prior to and following Mayor & Council meeting. The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney's Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk's Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro. Should you have questions, contact Samuel Rogers, Planner at (520) 837-6932 or Samuel.Rogers@tucsonaz.gov. xc: Project Record by Activity Number |
11/04/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
11/04/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | (This letter is viewable in the Documents section of PRO, titled "Water Availability Letter, Tucson Water") October 12, 2021 SUBJECT: Water Availability for Project: SW corner Golf Links & Kolb Rd., APN: 136-24-450A, Case#: WA3766, T-14 R-15 S-30, Lots: 9999, Location Code: TUC, Total Area: 12.36, Zoning: C-2. WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Sincerely, Michael Mourreale, Engineering Manager Tucson Water New Development |
11/26/2021 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | FROM: Julieann Arechederra GIS Cartographer, Pima County Assessor's Office DATE: November 22, 2021 RE: Assessor's Review and Comments Regarding: KOLB and GOLF LINKS S21-052 (2nd) X Plat meets Assessor's Office requirements. |
12/02/2021 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | Email from: <Addressing@pima.gov> To: CDRC Tue 11/30/2021 11:27 AM Kolb and Golf Links, 2nd Submittal Review: S21-052 is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official |
12/14/2021 | PETER MCLAUGHLIN | COT NON-DSD | COMMUNITY PLANNING | Passed |