Plan Number: S21-034
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S21-034
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/26/2021 SBEASLE1 START PLANS SUBMITTED Completed
08/26/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change To: Applicant
From: Planning & Development Svcs. Dept.

Please contact Tucson Water to request a Water Availability letter. Include the Letter in your next submittal. Mayor and Council cannot grant final approval for this Final Plat until water is assured and available.
08/26/2021 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change To: Applicant
From: Planning & Development Svcs. Dept.

Please contact Pima County Wastewater (email: Sewer@Pima.gov, phone 520-724-6500) and request approval. Include the Pima Co WW approval document in your next submittal. This will be required before the last step of Mayor and Council's final approval.
09/15/2021 STEVE SHIELDS ZONING REVIEW Approved
09/16/2021 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The ATTACHED PDF mentioned below can be viewed in the "Documents" section of PRO, titled: "Pima Co Addressing Review Comments")

Email from: <Addressing@pima.gov>
To: CDRC
Wed 9/15/2021 9:45 AM

Valencia Crossing, Final Plat, S21-034, 2nd submittal is being Returned for Corrections by Pima County Addressing. The attached pdf contains Addressing’s comments.
Please let me know if you have any questions.

Thank you,
Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
10/18/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Email from: COTDSDPermits
To: Chuck Martin
Mon 10/18/2021 4:50 PM

Returned for Corrections: S21-034
DESCRIPTION: FINAL PLAT - Valencia Crossing, 4711 E VALENCIA CROSSING DR

Fee Balance: $0 (zero) Thank you for the payment.

REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab and you will see different sections
- Reviews section - click on REVIEW DETAILS
- Documents section - click on VIEW

INCLUDE IN RESUBMITTAL
1) Comment Response Letter (your response to any Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

Please title your THIRD submittal documents according to this example: 3_Comment Response Letter

FILEDROP for Resubmittal
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
- Select "Existing Application"
- In the "Permit Number" field, enter the number and, if applicable, any notes for our staff


Thank you.
Sharon Beasley, Permit Specialist

City of Tucson, Planning and Development Services
Email for Development Pkgs: COTDSDpermits@TucsonAz.gov
(disregard the email response that will be sent automatically)
10/18/2021 SBLOOD1 ENGINEERING REVIEW Reqs Change See previous comment No. 2 - Add the Tentative Plat activity number as a related case number near the title block. I don't see the Tentative Plat activity number DP20-0232. Please revise.
11/16/2021 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Email from: TEPDEVREV@tep.com
To: CDRC
Fri 10/8/2021 11:09 AM

1. Onsite Easements for TEP facilities, as identified on the Preliminary Drawing, must be shown on the final plat before TEP will approve the plat. Please email a copy of the Final Plat to ctejeda@tep.com.

2. Offsite Easements for TEP facilities, as identified on the Preliminary Drawing, will be obtained by separate instrument. If applicable, it is the developer’s responsibility to ensure that offsite easements can be obtained from the adjacent property owner. Please provide a surveyed legal description for each of the offsite easements to ctejeda@tep.com. A copy of TEP’s standard for legal descriptions, SR-108, is attached for your surveyor’s reference in preparing the legal descriptions. TEP will prepare the easement document for signature.

3. Also as noted on the drawing are the TEP facilities crossing requirements, which include: A Railroad permit will be required from UPPR, Permission to cross the gas line easement will need to be granted, and Permits will need to be obtained from City of Tucson to cross Julian Wash, and from Pima County to cross The Loop. Should you have any easement questions, please contact Courtney Tejeda in our Land Resources department at (520) 820-9154.

Regards,
Courtney Tejeda
Tucson Electric Power Co.
11/16/2021 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved EMail from: TEP-DEVREV </O=TUCSON ELECTRIC POWER COMPANY/OU=EXCHANGE ADMINISTRATIVE GROUP /CN=RECIPIENTS/CN=8ABEC016574B419FAAED4325360>
To: CDRC
Tue 11/16/2021 4:49 PM

Tucson Electric Power Co. (TEP) has reviewed the plans submitted on August 26th, 2021, and has no objections at this time.
If revisions are needed to the current design - additional easements are required for TEP facilities. They will need to be obtained by separate instrument.

Tucson Electric Power Co.
Land Resources Department
Attn: Courtney Tejeda