Plan Number: S21-031
Parcel: Unknown

Address:
2636 E GINTER RD

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S21-031
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/12/2021 SBEASLE1 START PLANS SUBMITTED Completed
08/12/2021 SBEASLE1 ZONING REVIEW Approved
08/12/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved July 22, 2021

Cypress Civil Development
2030 East Speedway Blvd., Suite 110
Tucson, AZ 85719
Attn: Theresa Hadley

SUBJECT: Water Availability for Project: 2636 E. Ginter Rd., APN: 140-27-057A,B (2) parcels,
Case#: WA3653, T-15 R-14 S-08, Lots: 9999, Location Code: TUC, Total Area: 4.26, Zoning: I-1.

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for
demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject
project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not limited
to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the
developer. If the existing water system is not capable of meeting the requirements of the proposed development,
the developer shall be financially responsible for modifying or enhancing the existing water system to meet those
needs. This letter shall be null and void two years from the date of issuance.

Issuance of this letter is not to be construed as agency approval of a water plan or as containing
construction review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.

Sincerely,
Michael Mourreale
Engineering Manager
Tucson Water New Development
08/12/2021 SBEASLE1 PIMA COUNTY WASTEWATER Passed Email From: Sewer <Sewer@pima.gov>
Sent: Tuesday, June 1, 2021 12:02 PM
To: 'Lisa Bowers' <lisa@metroted.com>

Subject: RE: Campbell Landing FP for sewer/PMOC review

Pima County does not need to review this project as there is no proposed public sewer, no existing public sewer or easements within the property, and no connections to the public sewer.

Hussein Al Zubaidi
Site Review Project Manager
Pima County Development Service Department
201 N. Stone Ave., 1st Floor
Tucson, AZ 85701
(520) 724-6404
09/02/2021 SBEASLE1 PIMA COUNTY ADDRESSING Approved Email from: <Addressing@pima.gov>
To: CDRC
Thu 9/2/2021 9:39 AM

Final Plat review, 2nd submittal, S21-031, Campbell Landing is Approved by Pima County Addressing.

Thank you,
Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
09/06/2021 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Email from: C.Tejeda@tep.com
To: CDRC
Fri 9/3/2021 10:11 AM

Tucson Electric Power Co. (TEP) has reviewed and has no objection the S21-031, Campbell Landing submitted on August 12th, 2021.

Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument. Removal or relocation of existing TEP facilities will be at the Developer’s expense.

Tucson Electric Power Co.
Land Resources Department
Attn: Courtney Tejeda
09/16/2021 SAMUEL ROGERS ZONING-DECISION LETTER REVIEW Reqs Change September 16, 2021
Tucson Expediting and Development
Attn: Lisa Bowers
2030 E Speedway Blvd.
Tucson, AZ 85719

Subject: Final Plat for (S21-031) Cambell Landing Lots 1 through 4

The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit five (5) weeks in advance to the next available Mayor & Council meeting, October 19, 2021. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 3rd floor lobby drop box for us to obtain City staff's signatures:

1. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank.

2. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid.

3. Check or money order made payable to "Pima County Recorder" in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder's Office at 520-740-4350. Check must be pre-printed with name and address and dated within 45 days of the scheduled Mayor & Council meeting.

4. Original set of executed and notarized CC&R (if applicable).

5. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement.

6. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk's Office one (1) week prior to and following Mayor & Council meeting.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney's Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk's Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.

Should you have questions, contact Samuel Rogers, Planner at (520) 837-6932 or Samuel.Rogers@tucsonaz.gov.

xc: Project Record by Activity Number