Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S21-012
Parcel: Unknown

Address:
5001 E GLENN ST

Review Status: Completed

Review Details: FINAL PLAT - PACKAGE

Plan Number - S21-012
Review Name: FINAL PLAT - PACKAGE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/14/2021 SBEASLE1 START FINAL PLAT PACKAGE Completed
06/14/2021 SBEASLE1 PIMA COUNTY WASTEWATER Approved Final Plat Approval
Record Number: P21WS00036

Project Name: TERRAZA MODERNA
Approval issue date: 5/18/2021
Applicant: Oracle Engineering
Owner Name: Stewart Title & Trust No. 3760

The Pima County Development Services Department has reviewed the above referenced project and hereby approves the Final Plat, based upon PCRWRD Engineering Design Standards (EDS) 2016.

Please note any changes and/or revisions to the approved plans shall require a re-submittal to the department for review and evaluation.

Pima County Development Services
www.Pima.Gov
06/14/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved August 12, 2020

Oracle Engineering
3544 N. Romero Rd.
Tucson, AZ 85705
Attn: Peter Salonga

SUBJECT: Water Availability for Project: 5001 E. Glenn St., APN: 110100400, Case #: WA3209,
T-13 R-14 S-35, Lots: 9999, Location Code: TUC, Total Area: 1.73ac, Zoning: R-1

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for
demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject
project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not limited
to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the
developer. If the existing water system is not capable of meeting the requirements of the proposed development,
the developer shall be financially responsible for modifying or enhancing the existing water system to meet those
needs.

This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing
construction review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.

Michael Mourreale, P.E., Engineering Manager
Tucson Water Department
07/07/2021 LOREN MAKUS ENGINEERING REVIEW Approved
09/03/2021 ALEXANDRA HINES CDRC STAFF CITY AGENDA OFFICE Completed
09/15/2021 SROGERS2 CDRC STAFF CITY CLERK'S OFFICE Completed