Plan Number: S21-010
Parcel: Unknown

Address:
1995 E AJO WY

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S21-010
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/11/2022 SBLOOD1 ENGINEERING REVIEW Approved
01/13/2022 SAMUEL ROGERS ZONING-DECISION LETTER REVIEW Reqs Change January 13, 2022
Rick Engineering
Attn: Chuck Martin, R. A.
3945 E Fort Lowell Rd. Ste 111
Tucson, AZ 85712

Subject: Final Plat for (S21-010) South Gate Blocks C and D

The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit six (6) weeks in advance to the next available Mayor & Council meeting, March 8, 2022. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 3rd floor lobby drop box for us to obtain City staff's signatures:

1. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank.

2. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid.

3. Check or money order made payable to "Pima County Recorder" in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder's Office at 520-740-4350. Check must be pre-printed with name and address and dated within 60 days of the scheduled Mayor & Council meeting.

4. Original set of executed and notarized CC&R (if applicable).

5. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement.

6. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk's Office one (1) week prior to and following Mayor & Council meeting.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney's Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk's Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.

Should you have questions, contact Samuel Rogers at (520) 837-6932 or Samuel.Rogers@tucsonaz.gov.

xc: Project Record by Activity Number
11/11/2021 SBEASLE1 START PLANS SUBMITTED Completed
11/11/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved (This letter is viewable in the Documents section of PRO: "2i_Tucson Water, water availability letter, 09.20.21")

September 20, 2021

SUBJECT: Water Availability for Project: SW Kino Ajo Connection Ramp and Ajo Way,
APN: 132-08-2300, Case#: WA3740,T-14 R-14 S-29, Lots: XXXX, Location Code: TUC,
Total Area: 0.05ac, Zoning: I-1.

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for
demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject
project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not limited
to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the
developer. If the existing water system is not capable of meeting the requirements of the proposed development,
the developer shall be financially responsible for modifying or enhancing the existing water system to meet those
needs. This letter shall be null and void two years from the date of issuance.

Issuance of this letter is not to be construed as agency approval of a water plan or as containing
construction review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.

Sincerely,
Michael Mourreale, Engineering Manager
Tucson Water New Development
11/11/2021 SBEASLE1 PIMA COUNTY WASTEWATER Approved (This letter can be viewed in the "Documents" section of PRO: "2h_Approval Letter, P21ws00010, Pima Co Wastewater")

Sewer Layout Approval
RECORD: P21WS00010
Applicant: Rick Engineering
Owner Name: Title Security Agency Trust # 18375-T


Issued Date: 2/19/2021
Project: SOUTH GATE BLOCKS C AND D

The Pima County Development Services Department has reviewed the proposed sewer design for the above-referenced project and hereby approves the above referenced submittal of the Preliminary Sewer Layout (PSL), based upon PCRWRD Engineering Design Standards (EDS) 2016.

Please note any changes and/or revisions to the approved plans shall require a re-submittal to the department for review and evaluation.
11/26/2021 ED ABRIGO PIMA COUNTY ASSESSOR Approved FROM: Julieann Arechederra
GIS Cartographer, Pima County Assessor's Office

DATE: November 22, 2021
RE: Assessor's Review and Comments Regarding:
SOUTH GATE S21-010 (3rd)

X Plat meets Assessor's Office requirements.
12/10/2021 STEVE SHIELDS ZONING REVIEW Approved
12/10/2021 KAY MARKS PIMA COUNTY ADDRESSING Approved Email from: <Addressing@pima.gov>
To: CDRC
Fri 12/10/2021 9:54 AM

South Gate, 2nd Submittal Review: S21-010 is Approved by Pima County Addressing.
Thank you,

Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701