Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S21-004
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/18/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
01/18/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Reqs Change | To Applicant: Please contact Tucson Water (or Ray Water Company, if applicable). Request a Water Availability letter. Include the Letter in your next submittal for this permit. Mayor and Council cannot grant approval until water is assured and available. |
01/18/2021 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
01/18/2021 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | To Applicant: Please provide an approval document in the next submittal. The Applicant is responsible for obtaining review and approval for wastewater from Pima County Wastewater (email: Sewer@Pima.gov, phone 520-724-6500) prior to Mayor & Council approval of this final plat. |
01/19/2021 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | FROM: Suzanne Gilpin, GIS Cartographer Pima County Assessor's Office (520)724-4387 DATE: January 19, 2021 RE: Assessor's Review and Comments Regarding Final Plat- S21-004 Houghton Reserve - 1st Submittal __X___ Plat does not meet Assessor's Office requirements. COMMENTS: " The title block must be in the lower right hand corner must have the section, township and range. "XX" for all is not adequate. " There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision. " The perimeter line must be solid and the heaviest line weight on the plat. The lot lines and common area lines must be solid and the next heaviest. Lines for erosion setbacks, floodplain lines etc. should be the lightest line weight and be dashed or dot-dashed. " Property is owned by Gegenheimer Properties LLLP and NOT Title Security Agency. If Title Security is to sign plat please record Deed prior to recording plat. |
02/17/2021 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Site Section Manager PROJECT: Houghton Reserve FINAL PLAT (1st Review) S21-004 TRANSMITTAL DATE: February 17, 2021 DUE DATE: February 17, 2021 COMMENTS: Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as “plat” or “plats.” A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder’s Office. The final plat is kept on file and becomes part of the permanent record for the subject site. 2-07.5.0 CONTENT REQUIREMENTS 1. COMMENT: 2-07.5.1.H – Provide the subdivision case number, S21-004, rezoning case number, C9-19-18, annexation case number C9-84-65 and the tentative plat case number, DP20-0179, adjacent to the title block on all sheets. 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2. COMMENT: 2-07.5.3.D. Revise the Approval and Recording Data Blocks to match what is shown in this section of AM 2-07 2-07.5.6 Protective Covenants Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will: 3. COMMENT: 2-07.5.6.A – The title on the CC&Rs should match the title block on the final plat. |
02/17/2021 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | 02/17/21 Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on January 18, 2021, and is unable to approve the plat at this time. Easements for TEP facilities, as identified on the Preliminary Construction Drawing provided on January 6, 2021, must be shown on the plat in order for TEP to approve. If there are any questions, please contact me at 520-401-9895. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road Tucson, AZ 85714-2114 Cell - 520-401-9895 mburke@tep.com |
02/23/2021 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Reqs Change | (The ATTACHED PDF mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.) 02/18/21 Houghton Reserve, Final Plat, S21-004, 1st submittal is being Returned for Corrections by Pima County Addressing. The attached pdf contains Addressing’s comments. Please let me know if you have any questions. Thank you, Robin Freiman, Addressing Official Pima County Development Services Departmen (520) 724-7570 |
03/04/2021 | SBLOOD1 | ENGINEERING | REVIEW | Reqs Change | 1. Engineering has reviewed the Final Plat for compliance with the Tentative Plat (DP20-0179) and although the Final Plat appear to match the Tentative Plat until the Tentative Plat is approved Engineering cannot approve the Final Plat. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
03/05/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | DATE: March 5, 2021 Returned for Corrections PERMIT/ACTIVITY: S21-004 DESCRIPTION: Final Plat - Houghton Reserve, Blocks 1 and 2, Lots 1-227 and common areas A,B,C, and D. An FLD Subdivision. 520 N HOUGHTON RD FEE BALANCE: $0 (zero) Thank you for the payment. RESUBMITTAL Submit the following documents to: https://docs.tucsonaz.gov/Forms/tucsonpermitapp (Select "Existing Application", then the permit number) 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff - Title the documents for your 2nd submittal starting with the submittal number, for example: 2_Plan_Set SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on View to the right of each document For all NEW development package submittals on the new Filedrop page, select the box: "SITE REVIEW...". Thank you. City of Tucson Attn: Sharon Beasley, Permit Specialist Planning and Development Services email: COTDSDPermits@TucsonAz.gov |