Plan Number: S20-068
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S20-068
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/05/2021 SBEASLE1 START PLANS SUBMITTED Completed
02/05/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved January 6, 2021

JAS Engineering
3710 E. Calle Cortez
Tucson, AZ 85716
Attn: Jeffrey A. Stanley

SUBJECT: Water Availability for Project: 2867 N. Alvernon Rd. APN: 111-06-185A,
Case #: WA3351, T-13 R-14 S-33 , Lots: 9999, Location Code: TUC, Total Area: .2ac,
Zoning: R-3

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for
demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject
project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not limited
to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the
developer. If the existing water system is not capable of meeting the requirements of the proposed development,
the developer shall be financially responsible for modifying or enhancing the existing water system to meet those
needs. This letter shall be null and void two years from the date of issuance.

Issuance of this letter is not to be construed as agency approval of a water plan or as containing
construction review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.
Sincerely,
Michael Mourreale, Engineering Manager
Tucson Water New Development
03/05/2021 SBEASLE1 PIMA COUNTY - ADDRESSING PIMA COUNTY - ADDRESSING Approved 03/04/21 Monte Vista, S20-068, 2nd submittal, Final Plat is Approved by Pima County Addressing.
Thank you,

Robin Freiman, Addressing Official
Pima County Development Services Department
Tucson, AZ 85701
(520) 724-7570
03/05/2021 SBLOOD1 ENGINEERING REVIEW Approved
03/05/2021 SBEASLE1 PIMA COUNTY - ADDRESSING PIMA COUNTY - ADDRESSING Approved Email from: Nicholas Jordan <Addressing@pima.gov>
To: CDRC and Jeff Stanley
Mon 5/3/2021 10:57 AM

The following addresses are in the map for S20-068. All addresses are under the existing parcel (111-06-185A) until new parcel numbers are released by the Assessor’s Office.

Lot 2 - 3860 E Monte Vista DR
Lot 1 - 3856 E Monte Vista DR

2867 N Alvernon WY was retired


Nicholas Jordan, Addressing Specialist

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701, (520) 724-9623
04/07/2021 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Completed Plat put on M&C agenda and delivered to City Clerk.