Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Plan Number: S20-055
Parcel: Unknown

Address:
2833 E 5TH ST

Review Status: Completed

Review Details: LOT SPLIT REVIEW

Plan Number - S20-055
Review Name: LOT SPLIT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/08/2020 SBEASLE1 START PLANS BEING WALKED THRU Completed
09/09/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
09/14/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved Tucson Water approves this lot split.

Thank you,

Ray Munoz
Ray.Munoz@TucsonAz.gov
09/16/2020 STEVE SHIELDS ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: Steve Shields
Section Manager

PROJECT: 2833 E 5th St. - R-1 Zone
S20-055
Land Split/Lot Line Reconfiguration (1st Review)

TRANSMITTAL DATE: September 16, 2020

This site is located in the R-1 zone (UDC 4.7.8).

SECTION 2-08.0.0: LAND SPLIT

2-08.4.0 FORMAT REQUIREMENTS
2-08.4.1 The drawing showing the proposed land split shall be:
2-08.4.1.C - Clearly show the proposed lot line on the plan along with distance and bearings for the proposed lot line. Until these are provided the legal descriptions cannot be verified.
2-08.5.0 CONTENT REQUIREMENTS
The drawing showing the proposed land split shall include the following:
2-08.5.B - Clearly show the proposed lots with distance and bearings labeled, see comment 1 above.
2-08.5.F - Depending on where the proposed property line is placed it appears that the existing garage located northwest of the eastern most residence will not meet perimeter yard setbacks. A neighbor sign off for setback waiver maybe required. The following statement needs to be provided on the plan:
"My Name is and I am the owner of the property located at . I have reviewed the site plan and I have no objection to structure being located or constructed from the property line as depicted on the site plan.
This signoff can be done by the current owner for his own property.

2-08.5.G - Provide the land area of each proposed lot in square feet or acreage.

2-08.5.G - Provide a lot coverage calculation for both proposed lots.
09/23/2020 KEN VAN KARSEN BUILDING-RESIDENTIAL REVIEW Completed
09/29/2020 SBLOOD1 ENGINEERING REVIEW Reqs Change 1. Show distinguishing line weights for existing and proposed lot lines.
2. Show all proposed lot lines with bearings and distances as per Section 2-08.5.B in the Administative Manual

Stephen Blood
stephen.blood@tucsonaz.gov
09/29/2020 SBEASLE1 ZONING-RECORDATION REVIEW Reqs Change DATE: Sept. 29, 2020

LAND SPLIT PLAN
RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: Resubmittal of your updated/corrected documents

DESCRIPTION: LAND SPLIT - 2833 E. 5th Street.
PERMIT/ACTIVITY: S20-055
FEE BALANCE: $0 (zero) Thank you for the payment.

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

YOUR NEXT STEP:
Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 2nd submittal documents starting with the
submittal number, for example: 2_Plan_Set

IMPORTANT:
On the Filedrop page, select the box: "Site Review/CDRC..."

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov