Plan Number: S20-053
Parcel: Unknown

Address:
3329 E GLENN ST

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S20-053
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/15/2021 SBEASLE1 START PLANS SUBMITTED Completed
02/15/2021 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved October 6, 2020

Spring Mill Properties
Attn: Talbott & Steve Denny

SUBJECT: Water Availability for Project: 3329 E. Glenn St., APN: 11106403G
Case #: WA3280, T-13 R-14 S-33, Lots: 9999, Location Code: TUC, Total Area: .36ac, Zoning: R-2

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for
demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject
project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not limited
to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the
developer. If the existing water system is not capable of meeting the requirements of the proposed development,
the developer shall be financially responsible for modifying or enhancing the existing water system to meet those
needs.

This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing
construction review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.
Michael Mourreale, Engineering Manager
Tucson Water New Development
02/15/2021 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
02/15/2021 SBEASLE1 PIMA COUNTY WASTEWATER Passed (See the complete email online: www.TucsonAz.gov/Pro. in the Documents section.)

02/10/21 email
To: Talbott Denny
From: Joseph Godoy

Since there is no new public sewer being installed, no onsite public sewer easements, and no new connections to the public sewer, there is no review required by Pima County.

Joseph Godoy, Site Division Manager, Pima Co. Development Svcs
email: Joseph.Godoy@Pima.gov
(520) 724-6756
02/16/2021 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change FROM: Suzanne Gilpin
GIS Cartographer
Pima County Assessor's Office, (520)724-4387
DATE: February 16, 2021
RE: Assessor's Review and Comments Regarding Final Plat- S20-053 3329 E GLENN STREET 1ST SUBMITTAL


__X___ Plat does not meet Assessor's Office requirements.

COMMENTS:

1. There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision.
2. The perimeter line must be solid and the heaviest lineweight on the plat. The lot lines and common area lines must be solid and the next heaviest. Lines for erosion setbacks, floodplain lines etc. should be the lightest lineweight and be dashed or dot-dashed.
3. All hatching, stippling, striping, etc. must be removed in the final plat, unless another agency requires it. If so all lettering must have the hatching, etc. cut away so they are legible.
4. All streets must be named and have dimensions, bearings and curve data.
5. All Adjacent subdivisions should be named, with map and plat in the appropriate areas around the subdivision. (NOT APN NUMBERS)
02/17/2021 SBLOOD1 ENGINEERING REVIEW Approved
03/16/2021 SBEASLE1 PIMA COUNTY ADDRESSING Approved 03/16/21 3329 East Glenn St, S20-053, Final Plat, 1st submittal, is Approved by Pima County Addressing.

Upon Final Plat recordation the addresses will be issued as follows:

Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
03/16/2021 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved 03/15/21 Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on February 15, 2021.
Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument.

Please contact me at 520-401-9895 should you have any questions.
Thank you,
Mary Burke, Senior Right of Way Agent

Tucson Electric Power Co.
Tucson, AZ 85714-2114
Cell - 520-401-9895, mburke@tep.com
03/22/2021 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: March 22, 2021
Returned for Corrections

PERMIT/ACTIVITY: S20-053
DESCRIPTION: FINAL PLAT - 3329 East Glenn Street. Lots 1 and 2.

FEES DUE: $ 1,116.50
Please pay the total fees (or at a minimum, the REVIEW Fees). A payment is required before your next submittal.
ONLINE PAYMENT
https://www.tucsonaz.gov/pdsd/fees
If information is not available or amount isn't correct, check back in a few hours after data is updated.
(Visa, MC, Discover, American Express, or pay from bank account)
1- Click on: Pay Planning & Permit Fees
2- Enter your Permit Nbr, example: dp20-0000
(not case-sensitive but a hyphen-dash- is needed)
3- Business/Individual Name: Leave blank
4- Click the blue tab: Continue
5- Under the Pay column, check the boxes
6- Click Continue

RESUBMITTAL
Submit the following documents to:
https://docs.tucsonaz.gov/Forms/tucsonpermitapp
(Select "Existing Application", then the permit number)

1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Title the documents for your 2nd submittal starting with the
submittal number, for example: 2_Plan_Set

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

For all NEW development package submittals on the Filedrop page, select the box: "SITE REVIEW...".

Thank you.

City of Tucson
Attn: Sharon Beasley, Permit Specialist
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov
(Disregard the automatic reply you will receive: "This email account is not...")
03/22/2021 STEVE SHIELDS ZONING REVIEW Approved