Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S20-053
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/15/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
02/15/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | October 6, 2020 Spring Mill Properties Attn: Talbott & Steve Denny SUBJECT: Water Availability for Project: 3329 E. Glenn St., APN: 11106403G Case #: WA3280, T-13 R-14 S-33, Lots: 9999, Location Code: TUC, Total Area: .36ac, Zoning: R-2 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Michael Mourreale, Engineering Manager Tucson Water New Development |
02/15/2021 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | |
02/15/2021 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Passed | (See the complete email online: www.TucsonAz.gov/Pro. in the Documents section.) 02/10/21 email To: Talbott Denny From: Joseph Godoy Since there is no new public sewer being installed, no onsite public sewer easements, and no new connections to the public sewer, there is no review required by Pima County. Joseph Godoy, Site Division Manager, Pima Co. Development Svcs email: Joseph.Godoy@Pima.gov (520) 724-6756 |
02/16/2021 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | FROM: Suzanne Gilpin GIS Cartographer Pima County Assessor's Office, (520)724-4387 DATE: February 16, 2021 RE: Assessor's Review and Comments Regarding Final Plat- S20-053 3329 E GLENN STREET 1ST SUBMITTAL __X___ Plat does not meet Assessor's Office requirements. COMMENTS: 1. There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision. 2. The perimeter line must be solid and the heaviest lineweight on the plat. The lot lines and common area lines must be solid and the next heaviest. Lines for erosion setbacks, floodplain lines etc. should be the lightest lineweight and be dashed or dot-dashed. 3. All hatching, stippling, striping, etc. must be removed in the final plat, unless another agency requires it. If so all lettering must have the hatching, etc. cut away so they are legible. 4. All streets must be named and have dimensions, bearings and curve data. 5. All Adjacent subdivisions should be named, with map and plat in the appropriate areas around the subdivision. (NOT APN NUMBERS) |
02/17/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
03/16/2021 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | 03/16/21 3329 East Glenn St, S20-053, Final Plat, 1st submittal, is Approved by Pima County Addressing. Upon Final Plat recordation the addresses will be issued as follows: Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
03/16/2021 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | 03/15/21 Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on February 15, 2021. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument. Please contact me at 520-401-9895 should you have any questions. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Tucson, AZ 85714-2114 Cell - 520-401-9895, mburke@tep.com |
03/22/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | DATE: March 22, 2021 Returned for Corrections PERMIT/ACTIVITY: S20-053 DESCRIPTION: FINAL PLAT - 3329 East Glenn Street. Lots 1 and 2. FEES DUE: $ 1,116.50 Please pay the total fees (or at a minimum, the REVIEW Fees). A payment is required before your next submittal. ONLINE PAYMENT https://www.tucsonaz.gov/pdsd/fees If information is not available or amount isn't correct, check back in a few hours after data is updated. (Visa, MC, Discover, American Express, or pay from bank account) 1- Click on: Pay Planning & Permit Fees 2- Enter your Permit Nbr, example: dp20-0000 (not case-sensitive but a hyphen-dash- is needed) 3- Business/Individual Name: Leave blank 4- Click the blue tab: Continue 5- Under the Pay column, check the boxes 6- Click Continue RESUBMITTAL Submit the following documents to: https://docs.tucsonaz.gov/Forms/tucsonpermitapp (Select "Existing Application", then the permit number) 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff - Title the documents for your 2nd submittal starting with the submittal number, for example: 2_Plan_Set SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on View to the right of each document For all NEW development package submittals on the Filedrop page, select the box: "SITE REVIEW...". Thank you. City of Tucson Attn: Sharon Beasley, Permit Specialist Planning and Development Services email: COTDSDPermits@TucsonAz.gov (Disregard the automatic reply you will receive: "This email account is not...") |
03/22/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved |