Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S20-050
Parcel: Unknown

Address:
811 S 4TH AV

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S20-050
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/01/2020 SBEASLE1 START PLANS SUBMITTED Completed
09/01/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved September 10, 2019

DOWL
430 W. Warner Rd. Suite B101
Tempe, AZ 85284
Attn: Erin O'Brien

SUBJECT: Water Availability for Project: 10206 E. Old Vail Rd, APN: 141186070, 141186080, 14118609A, 14118610B, Case #: WA2896 , T-15 R-15 S-35 , Lots: 5 , Location Code: TUC, Total Area: 1.37, Zoning: C-1

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas.
Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs.

This letter shall be null and void two years from the date of issuance.
Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.
Sincerely,
Michael Mourreale, P.E., Engineering Manager
Tucson Water Department
09/02/2020 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change FROM: Suzanne Gilpin, GIS Cartographer
Pima County Assessor’s Office (520)724-4387

DATE: September 1, 2020

RE: Assessor’s Review and Comments Regarding Final Plat- S20-050 - 811 SOUTH 4TH AVENUE (FINAL PLAT)

__X___ Plat does not meet Assessor’s Office requirements.

COMMENTS:
Ownership in the dedication section of plat must read the same as of record. The current record owner is Fernando Fernandez Chiquette and the plat must read as such.
09/24/2020 SBEASLE1 UTILITIES SOUTHWEST GAS Passed
09/24/2020 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change To Applicant: Please provide an approval document in the next submittal. The Applicant is responsible for obtaining review and approval for wastewater from Pima County (email: Sewer@Pima.gov) prior to Mayor & Council approval of this final plat.
09/30/2020 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change (The ATTACHED DRAWING mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on September 1, 2020, and is unable to approve the plat.

TEP easements, as identified on the preliminary electrical design drawing provided to the customer on October 31, 2019, must be shown on the final plat.

Per the attached drawing, the 10’ wide Electric Easement must be extended across Lots 1 and 4 to accommodate proposed equipment on these Lots.

Please note that the referenced electrical design is “preliminary” and is now close to a year old. The design will need to be reviewed prior to obtaining a final Construction drawing. In order to proceed to a Construction drawing, please contact TEP Project Manager, Amanda Whitney at awhitney@tep.com or at 520-526-4350.

If there are any questions regarding the final plat comments, please contact me at 520-401-9895.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co.
09/30/2020 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The ATTACHED PDF mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

Final Plat, 811 S. 4th Avenue, S20-050, 1st submittal is being Returned for Corrections by Pima County Addressing.

The attached pdf contains Addressing’s comments.

Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Dept
(520) 724-7570
10/02/2020 STEVE SHIELDS ZONING REVIEW Approv-Cond However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised development package to verify that those changes do not affect any zoning requirements.
10/20/2020 SBLOOD1 ENGINEERING REVIEW Reqs Change 1. What assurable items still remain and if any what assurance mechanism will be used

Stephen Blood
Stephen.blood@tucsonaz.gov
10/21/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: Oct. 21, 2020

RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: Resubmittal of your updated/corrected documents

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

DESCRIPTION: FINAL PLAT - 811 South 4th Avenue, Lots 1-7.

PERMIT/ACTIVITY: S20-050

FEE BALANCE: $0 (zero) Thank you for the payment.

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

YOUR NEXT STEP:
Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 2nd submittal documents starting with the
submittal number, for example: 2_Plan_Set

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov