Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S20-047
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/19/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
01/19/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | December 30, 2019 EEC 555 E River Rd,, Suite 301, Tucson, AZ 85704 Attn: Ryan Stucki, P.E. SUBJECT: Water Availability for Project: 9801 E. Drexel Rd, APN: 141020230, Case #WA2998 T-15 R-15 S-02, Lots: 9999, Location Code: TUC, Total Area: 46.56, Zoning: PAD-30 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Michael Mourreale, P.E., Engineering Manager Tucson Water Department |
02/04/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
02/08/2021 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | 02/04/21 Tucson Electric Power Co., (TEP) has reviewed and approves the revised final plat for Saguaro Trails Block 6, as submitted to TEP by EEC on February 3, 2021, showing the addition of a TEP easement between Lots 320 and 321. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. If you have any questions, please contact me at 520-401-9895. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co., Land Resources – RC 131 3950 E. Irvington Road, Tucson, AZ 85714-2114 Cell - 520-401-9895, mburke@tep.com |
03/08/2021 | SBLOOD1 | ENGINEERING | REVIEW | Approved | |
03/09/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | DATE: March 9, 2021 Returned for Corrections PERMIT/ACTIVITY: S20-047 DESCRIPTION: FINAL PLAT - Saguaro Trails, Block 6. Lots 142-354, 9801 E DREXEL RD FEE BALANCE: $0 (zero) Thank you for the payment. RESUBMITTAL Submit the following documents to: https://docs.tucsonaz.gov/Forms/tucsonpermitapp (Select "Existing Application", then the permit number) 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff - Title the documents for your 3rd submittal starting with the submittal number, for example: 3_Plan_Set SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on View to the right of each document For all NEW development package submittals on the Filedrop page, select the box: "SITE REVIEW...". Thank you. City of Tucson Attn: Sharon Beasley, Permit Specialist Planning and Development Services email: COTDSDPermits@TucsonAz.gov |
03/09/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | March 12, 2021 EEC Attn: Ryan Stucki 555 E River Rd Tucson, AZ 85704 Subject: Final Plat for (S20-047) Saguaro Trails – Block 6, Residential Lots 142-354 The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit five (5) weeks in advance to the next available Mayor & Council meeting, April 20, 2021. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 2nd floor lobby drop box for us to obtain City staff's signatures: 1. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave Date and Time blank. 2. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid. 3. Check or money order made payable to “Pima County Recorder” in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder’s Office at 520-740-4350. Check must be pre-printed with name and address and dated within 45 days of the scheduled Mayor & Council meeting. 4. Original set of executed and notarized CC&R (if applicable). 5. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement. 6. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk’s Office one (1) week prior to and following Mayor & Council meeting. The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney’s Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk’s Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro. Should you have questions, contact Alexandra Hines at alexandra.hines@tucsonaz.gov. xc: Project Record by Activity Number |
03/26/2021 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | (The ATTACHED PDF mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.) 02/10/21 Saguaro Trails, S20-047, 2nd submittal, is being Returned for Corrections by Pima County Addressing. The attached pdf contains Addressing’s comments. Please let me know if you have any questions. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701(520) 724-7570 |
03/26/2021 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | 03/26/21 Saguaro Trails, S20-047, 3rd submittal, is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |