Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S20-032
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/06/2021 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
08/06/2021 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | FROM: Suzanne Gilpin, GIS Cartographer, Pima County Assessor's Office, (520)724-4387 DATE: August 6, 2021 RE: Assessor's Review and Comments Regarding Final Plat- S20-032 LA ALBORADA APARTMENTS __X___ Plat does not meet Assessor's Office requirements. COMMENTS: 1. There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision. 2. All Adjacent subdivisions should be named, with map and plat in the appropriate areas around the subdivision. |
08/09/2021 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Passed | Email from: <Addressing@pima.gov> To: CDRC Fri 8/6/2021 3:18 PM Pima County Addressing does not need to review the 3rd submittal of S20-32. Thank you Nicholas Jordan, Addressing Specialist Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-9623 |
08/16/2021 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | August 24, 2020 Cypress Civil Development 2030 E. Speedway Blvd Suite 110 Tucson, AZ 85719 Attn: Theresa Hadley SUBJECT: Water Availability for Project: 250 E. Grant Rd., APN: 11501155V, Case #: WA3225, T-14 R-13 S-01, Lots: 9999, Location Code: TUC, Total Area: 2.52ac, Zoning: C-2 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Michael Mourreale, P.E. Engineering Manager Tucson Water Department |
08/30/2021 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
10/01/2021 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
10/05/2021 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Email from: COTDSDPermits To: lisa bowers Tue 10/5/2021 5:27 PM Returned for Corrections: S20-032 DESCRIPTION: FINAL PLAT - La Alborada Apartments - Cell Tower Split Lots 1-2. Fee Balance: $0 (zero) Thank you for the payment. REVIEW COMMENTS and documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab and you will see different sections - Reviews section - click on REVIEW DETAILS - Documents section - click on VIEW INCLUDE IN RESUBMITTAL 1) Comment Response Letter (your response to any Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff Please title your 4th submittal documents according to this example: 4_Comment Response Letter FILEDROP for Resubmittal https://docs.tucsonaz.gov/Forms/tucsonpermitapp - Select "Existing Application" - In the "Permit Number" field, enter the number and, if applicable, any notes for our staff Sharon Beasley, Permit Specialist City of Tucson, Planning and Development Services Email for Development Pkgs: COTDSDpermits@TucsonAz.gov (disregard the email response that will be sent automatically) |
10/05/2021 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Email from: TEPDEVREV@tep.com To: CDRC Mon 10/4/2021 5:12 PM Tucson Electric Power Co. (TEP) reviewed and approved the final plat submitted on August 6th, 2021. Tucson Electric Power Co. Land Resources Department Attn: Courtney Tejeda |