Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S20-028
Parcel: Unknown

Address:
375 S STONE AV

Review Status: Completed

Review Details: LOT SPLIT REVIEW

Plan Number - S20-028
Review Name: LOT SPLIT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/23/2020 SBEASLE1 START PLANS SUBMITTED Completed
04/23/2020 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

PDSD TRANSMITTAL

FROM: Steve Shields
Section Manager

PROJECT: Parcel 117-14-0860, 117-14-0870 & 117-14-0890
Land Split (1st Review) - 375 S STONE Avenue
S20-028 - C-3 Zoning

TRANSMITTAL DATE: April 23, 2020

DUE DATE: April 28, 2020

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) 8.3.1 Land Split and Administrative Manual (AM) Section 2-08. Also compliance with applicable development criteria for the proposed or existing use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

***Please address zoning review comments below related to sections 2-08.4 - 2-08.5 and re-submit plans and any requested documents.

8.3.1. LAND SPLIT

8.3.1.A. Purpose

According to A.R.S. ยง9-463.01(T), the City may regulate a land split as defined in Section 11.4.13 within its jurisdictional limits. The state law gives the City authority to determine the division lines, area, and shapes of the parcels. Neither a tentative plat nor a final plat is required but the resulting tracts or parcels shall conform to applicable zoning requirements and other government codes and ordinances. The purpose of this section is to establish a review process for land splits. This review:

8.3.1.A.1. Assures that newly created tracts or parcels are of sufficient size to be developed and meet the requirements of applicable zoning classification;

8.3.1.A.2. Assures that the newly created tracts or parcels have locations for building pads that are protected from flood and erosion hazards as defined in the Floodplain Ordinance (Tucson Code Chapter 26) and Standards Manual for Drainage Design and Floodplain Management in Tucson, Arizona; and,

8.3.1.A.3. Assures that all tracts or parcels resulting from a land split shall have adequate access as specified by Section 7.8, Access, of the UDC , Sections 7-01.0.0, Pedestrian Access, and 10-01.0.0, Street Technical Standard, of the Technical Standards Manual and City of Tucson Drainage Manuals.

8.3.1.B. Applicability
A proposed land split shall be submitted to PDSD for review and approval as provided in this section.

8.3.1.C. Pre-application Conference Recommended A pre-application conference is encouraged, but not required.

8.3.1.D. Application Required
Submittal of an application to the PDSD is required in order to process the request. The application must be in accordance with Section 2-08.0.0, Land Split Applications, of the Administrative Manual. Applications are reviewed for completeness in accordance with Section

3.2.3, Application Requirements.

8.3.1.E. Review
Land splits are reviewed by the PDSD for compliance with the following requirements:

8.3.1.E.1. Does not constitute a subdivision as defined in Section 11.4.20 which would require compliance with platting requirements of Section 8.4;

8.3.1.E.2. Results in tracts or parcels which conform to the minimum lot size requirements of the property's zone;

8.3.1.E.3. Provides access to the proposed tracts or parcels in accordance with Section 7.8, Access, of the UDC , Sections 7-01.0.0, Pedestrian Access, and 10-01.0.0, Street Technical Standard, of the Technical Standards Manual, and the City of Tucson Floodplain Ordinance and Drainage Manuals;

8.3.1.E.4. Results in all existing buildings complying with the perimeter yard requirements of the property's zone; and,

8.3.1.E.5. Results in tracts or parcels of at least the minimum size required to build in accordance with the applicable zoning including any natural, environmental and floodplain requirements in accordance with the City of Tucson Floodplain Ordinance and Drainage Manuals.
8.3.1.F. Decision
8.3.1.F.1. The PDSD Director decides whether to approve or deny an application.
8.3.1.F.2. The PDSD will notify the applicant if the land split has been approved.
8.3.1.G. Recordation Required

After approval, the deeds for the land split shall be recorded at the Pima County Recorder's Office by the applicant/owner or his designated agent.

A.M. 2-08.1.0 PURPOSE
The purpose of this Section is to provide the submittal requirements for land splits.

2-08.2.0 APPLICABILITY
Proposed land splits as defined in Article 8 of the Unified Development Code (UDC) shall be prepared according the requirements provided below.

1. 2-08.4.2 Provide a survey drawings that shows all distances and bearings so that the accuracy of the legal descriptions can be verified.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Corrected plans, requested or required documents as noted by zoning comments.
04/24/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
04/28/2020 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Provide a site plan showing the boundaries of the proposed lots with boundary information.
2. Include location and size of existing buildings on the site plan.
Loren Makus, EIT
loren.makus@tucsonaz.gov
05/01/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved Tucson Water approves lot split.

Thank you,
Ray Munoz
Ray.Munoz@TucsonAz.gov
Tucson Water
05/06/2020 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Approved
05/07/2020 SBEASLE1 ZONING-RECORDATION REVIEW Reqs Change LAND SPLIT PLAN
RETURNED FOR CORRECTIONS NOTICE
Note: A resubmittal with a Comment Response Letter is required.

PERMIT: S20-028
DESCRIPTION: LAND SPLIT, reconfiguration / IID - 375 S. Stone Avenue.
FEES DUE: $0 (zero) Thank you for the payment.

SEE REVIEW COMMENTS and your documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Reviews section, click on Review Details
- Documents section, click on blue icon to the right of each document

YOUR NEXT STEPS: Submit the following items to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Any other items requested by reviewers

CONTACT US Monday-Friday, 8:00 am to 12:00 noon
https://www.tucsonaz.gov/pdsd/virtual-service-counter
For information or an over-the-counter review, sign in to the
Virtual Service Counter and we will give you a call.


Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
05/07/2020 SBEASLE1 OUT TO CUSTOMER Completed