Plan Number: S20-025
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S20-025
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/01/2020 SBEASLE1 START PLANS SUBMITTED Completed
09/01/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved May 4, 2020

Atwell
4700 E. Southern Ave.
Mesa, AZ 85206
Attn: Dennis E. Roberts, P.E.

SUBJECT: Water Availability for Project: 6700-6800 Block of E. Camino Boleadoras,
APN: 141366800,880,890,900,910,920,930,940 & 960, Case #: WA3112, T-15 R-15 S-19, Lots: 9999,
Location Code: TUC, Total Area: 106.97 ac, Zoning: PAD-7

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration
of a 100-year water supply - it does not mean that water service is currently available to the subject project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not
limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by
the developer. If the existing water system is not capable of meeting the requirements of the proposed
development, the developer shall be financially responsible for modifying or enhancing the existing water system
to meet those needs.

This letter shall be null and void two years from the date of issuance.
Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction
review comments relative to conflicts with existing water lines and the proposed development. If you have
any questions, please call New Development at 791-4718.

Michael Mourreale, P.E., Engineering Manager
Tucson Water Department
09/24/2020 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change To Applicant: Please provide an approval document in the next submittal. The Applicant is responsible for obtaining review and approval for wastewater from Pima County (email: Sewer@Pima.gov) prior to Mayor & Council approval of this final plat.
09/29/2020 STEVE SHIELDS ZONING REVIEW Approved
09/30/2020 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The ATTACHED PDF mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

Final plat review, S20-025, La Estancia parcel 5, 2nd submittal, is being Returned for Corrections by Pima County Addressing.

The attached pdf contains Addressing’s comments.

Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Dept
(520) 724-7570
10/02/2020 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the final plat for La Estancia Phase 2, Parcel 5. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission.

If there are any questions, please contact me at 520-401-9895. Thank you,

Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road
Tucson, AZ 85714-2114
Cell - 520-401-9895
mburke@tep.com
10/09/2020 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change S20-025

1) Previous Comment 4/5. These comments were partially addressed. As shown in the Tentative plat the 40' drainage easement along the western property line falls outside of this proposed subdivision boundary. Construction of this drainage channel is required for the drainage system to function adequately. Provide a copy of the assurance agreement which shows the construction of this channel as being part of the required improvements for the subdivision
2) New Comment Plat. The Tentative Plat shows The El Paso Natural Gas easement. The new proposed final plat shows this as now being common area CA "F5". Clarify if this is Property or an easement.
3) Approval of the associated Tentative Plat is required prior to final plat approval

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
10/14/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change DATE: Oct. 14, 2020
RETURNED FOR CORRECTIONS NOTICE
Your Next Steps: Resubmittal of your updated/corrected documents

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

DESCRIPTION: FINAL PLAT - PARCEL 5, La Estancia de Tucson, Phase 2.

PERMIT/ACTIVITY: S20-025
FEE BALANCE: $0 (zero) Thank you for the payment.

SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, Activity Search, enter the Activity/Permit Number
- Permits - click on blue tab
- Reviews - click on Review Details
- Documents - click on View to the right of each document

YOUR NEXT STEP:
Submit documents to the Filedrop
https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter
(your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set, even if no changes were made)
3) Any other documents requested by review staff

- Name the 3rd submittal documents starting with the
submittal number, for example: 3_Plan_Set

IMPORTANT: On the Filedrop page, select the box: "Site Review/CDRC..." when sending your next submittal.

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
email: COTDSDPermits@TucsonAz.gov