Plan Number: S20-022
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S20-022
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/25/2020 SBEASLE1 START PLANS SUBMITTED Completed
08/25/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved May 4, 2020

SUBJECT: Water Availability for Project: 6700-6800 Block of E. Camino Boleadoras,
APN: 141366800,880,890,900,910,920,930,940 & 960, Case #: WA3112, T-15 R-15 S-19, Lots: 9999,
Location Code: TUC, Total Area: 106.97 ac, Zoning: PAD-7

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration
of a 100-year water supply - it does not mean that water service is currently available to the subject project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not
limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by
the developer. If the existing water system is not capable of meeting the requirements of the proposed
development, the developer shall be financially responsible for modifying or enhancing the existing water system
to meet those needs.

This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development.

If you have any questions, please call New Development at 791-4718.

Michael Mourreale, P.E., Engineering Manager
Tucson Water Department
08/25/2020 SBEASLE1 PIMA COUNTY WASTEWATER Approved Preliminary Sewer Layout Approval

Record Number: P20WS00005
Project Name: La Estancia Phase II Parcels 1 & 2
Approval issue date: 07/08/2020
Applicant: Atwell-Group, Dennis Roberts
Owner Name: Landmark Title TR 18380-T, Attn: Sunbelt Holdings, Greg Mohl

The Pima County Development Services Department has reviewed the abovereferenced project and hereby approves the PSL, based upon PCRWRD Engineering
Design Standards (EDS) 2016.

Please note any changes and/or revisions to the approved plans shall require a re-submittal to the department for review and evaluation.
09/16/2020 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co. (TEP) has reviewed and approves the final plat for La Estancia Ph2 Parcel 2, submitted on August 25, 2020. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission.

If there are any questions, please contact me at 520-401-9895. Thank you,

Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co.
09/21/2020 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The "ATTACHED PDF" mentioned below can be viewed online: www.TucsonAz.gov/Pro. See the Documents section.)

La Estancia, final plat parcel 2, S20-022, 2nd submittal, is being Returned For Corrections by Pima County Addressing.
The attached pdf contains Addressing’s comments. Please let me know if you have any questions. Thank you.

Robin Freiman, Addressing Official

Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
09/24/2020 STEVE SHIELDS ZONING REVIEW Approved
09/29/2020 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change S20-022

1) Previous Comment 4. The tentative plat shows drainage basins as being required for this this subdivision. The assurance agreement must show that these areas, though they are not part of this plat, must be constructed. Or the assurance agreement can state that no releases can occur until any associated offsite drainage infrastructure has been built. However those drainage areas that need to be built need to be specifically identified
2) Previous Comment 5. Provide a copy of the assurance agreement upon next submittal

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
09/30/2020 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change September 29, 2020
Atwell Group
Attn: Dennis Roberts
4700 E Southern Av
Mesa, AZ 85206

Subject: Final Plat for (S20-022) La Estancia De Tucson Phase 2, Parcel 2 Lots 1-78

The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit five (5) weeks in advance to the next available Mayor & Council meeting, November 4, 2020. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 2nd floor lobby drop box for us to obtain City staff's signatures:

1. Address Engineering and Addressing review comments on the executed mylar with a comment response letter.

2. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'. Leave the date and time blank.

3. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid.

4. Check or money order made payable to “Pima County Recorder” in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder’s Office at 520-740-4350. Check must be pre-printed with name and address and dated within 45 days of the scheduled Mayor & Council meeting.

5. Original set of executed and notarized CC&R (if applicable).

6. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement.

7. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk’s Office one (1) week prior to and following Mayor & Council meeting.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney’s Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk’s Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.

Should you have questions, contact Alexandra Hines at alexandra.hines@tucsonaz.gov.

xc: Project Record by Activity Number