Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S20-019
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/07/2020 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
07/07/2020 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | May 4, 2020 Atwell 4700 E. Southern Ave. Mesa, AZ 85206 Attn: Dennis E. Roberts, P.E. SUBJECT: Water Availability for Project: 6700-6800 Block of E. Camino Boleadoras, APN: 141366800,880,890,900,910,920,930,940 & 960, Case #: WA3112, T-15 R-15 S-19, Lots: 9999, Location Code: TUC, Total Area: 106.97 ac, Zoning: PAD-7 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Michael Mourreale, P.E., Engineering Manager Tucson Water Department |
07/07/2020 | SBEASLE1 | PIMA COUNTY | WASTEWATER | Reqs Change | Applicant has submitted plat to Pima County. Approval by Pima County is pending. Applicant is responsible for obtaining review and approval for wastewater from Pima County (email: Sewer@Pima.gov) prior to Mayor & Council approval of this final plat. |
07/22/2020 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | 07/21/20 La Estancia Phase 2, parcel 1, Lots 1-193 (final plat), S20-019 , 2nd submittal is Approved by Pima County Addressing. Robin Freiman, Addressing Official Pima County Development Services Department (520) 724-7570 |
07/31/2020 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC Transmittal TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Site Section Manager PDSD Zoning Review Section PROJECT: La Estancia, Phase 2, parcel 1. Lots 1-193. 6890 E Camino Boleadoras Final Plat (2nd Review), S20-019 TRANSMITTAL DATE: July 31, 2020 DUE DATE: August 03, 2020 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 2. This comment was not addressed. Label all subdivisions within the location map area shown. 2-07.5.1.A.4. - On the project location map on sheet 1 include the subdivisions within the map area. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
08/03/2020 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the final plat for La Estancia Parcel 1, submitted on July 7, 2020. TEP easements are shown as requested. Electric service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. If there are any questions, please contact me at 520-401-9895. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Office - 520-917-8744, mburke@tep.com |
08/12/2020 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | DATE: Aug. 12, 2020 RETURNED FOR CORRECTIONS NOTICE Your Next Step: Resubmittal of documents DESCRIPTION: FINAL PLAT - La Estancia, Phase 2, parcel 1. Lots 1-193. Common area A1, B1, C1, D1, E1, F1, G1, H1, I1, and J1 (drainage, retention). PERMIT/ACTIVITY: S20-019 FEE BALANCE: $0 (zero) Thank you for the payment. SEE REVIEW COMMENTS and your submitted documents on PRO: www.tucsonaz.gov/pro (If information is not available, check back later after data transfers to PRO.) - Home page, Activity Search, enter the Activity/Permit Number - Permits - click on blue tab - Reviews - click on Review Details - Documents - click on View to the right of each document YOUR NEXT STEP: Submit documents to the Filedrop https://www.tucsonaz.gov/file-upload-pdsd 1) Comment Response Letter (your response to the reviewer's Requires Change comments) 2) Plan Set (all pages, full set, even if no changes were made) 3) Any other documents requested by review staff - Name the 3rd submittal documents starting with the submittal number, for example: 3_Plan_Set FOR FASTER PROCESSING: When on the Filedrop page, select the box "Development Package or Land Division". This applies to all DP submittals, DP resubmittals, and DP revisions - and all Land Splits. (For Building Permits, continue to select "Resubmittals/Revisions...".) Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services email: COTDSDPermits@TucsonAz.gov |
08/12/2020 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Tentative plat must be approved first. 2. Use the correct DP number for the previous cases near the title block. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/12/2020 | SBEASLE1 | OUT TO CUSTOMER | Completed |