Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S20-012
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S20-012
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/22/2020 SBEASLE1 START PLANS SUBMITTED Completed
04/24/2020 ED ABRIGO PIMA COUNTY ASSESSOR Approved Southland Heights Final Plat S20-012 meets the Assessor’s Office requirements.
Joyce L Hays

Pima County Assessor’s Office
Program Manager
(Property Ownership and Mapping)
240 N. Stone Ave., Tucson AZ 85701
Phone: 520-724-8257
05/06/2020 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved May 4, 2020

SUBJECT: Water Availability for Project: 5758 S. Southland, APN: 140230110, Case #: WA3109,
T-1 R-14 S-07, Lots: 9999, Location Code: TUC, Total Area: .25ac, Zoning: R-2

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson
Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources
(ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration
of a 100-year water supply - it does not mean that water service is currently available to the subject project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an
application is received. The developer shall be required to submit a water master plan identifying, but not
limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed
Connection Points to Existing Water System; and 5) Easements/Common Areas.
Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by
the developer. If the existing water system is not capable of meeting the requirements of the proposed
development, the developer shall be financially responsible for modifying or enhancing the existing water system
to meet those needs.

This letter shall be null and void two years from the date of issuance.
Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction
review comments relative to conflicts with existing water lines and the proposed development.
If you have any questions, please call New Development at 791-4718.

Michael Mourreale, P.E.
Engineering Manager
Tucson Water Department
05/08/2020 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
05/15/2020 ANDREW CONNOR LANDSCAPE REVIEW Approved
05/18/2020 LOREN MAKUS ENGINEERING REVIEW Approved Add 'Lots 1 & 2' after 'Southland Heights' and before 'Being a Resubdivision' in the title block.
05/18/2020 STEVE SHIELDS ZONING REVIEW Approved
05/22/2020 SBEASLE1 PIMA COUNTY ADDRESSING Approved Pima County Addressing grants full approval of Southland Heights, S20-012, 2nd submittal.

Nicholas Jordan, Addressing Specialist

Pima County Development Services Department
(520) 724-9623
05/27/2020 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change May 27, 2020
JAS Engineering
Attn: Jeff Stanley
3650 N Oracle Rd
Tucson, AZ 85705

Subject: Final Plat for (S20-012) Southland Heights Lots 1 & 2

The above referenced project has been conditionally-approved by the City Development Review Committee (CDRC) to prepare for Mayor & Council approval. Please submit five (5) weeks in advance to the next available Mayor & Council meeting, July 7, 2020. Please take the following actions and upload PDF scans of items listed. Once Engineering approves folder in 'Final Plat Package' workflow (5-10 day review), then hand deliver items to 2nd floor lobby drop box for us to obtain City staff's signatures:

1. Address Engineering review comments along with comment response letter. 1) Add “Lots 1 & 2” after “Southland Heights” and before “Being a Resubdivision” in title block.

2. Original set of executed and notarized (permanent, black ink only) Final Plat on double matte océ or photo mylar. Fill in blank for 'filed at the request of ____'.

3. Title report current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid.

4. Check or money order made payable to “Pima County Recorder” in the amount of: $24.00 for the first plat sheet and $20.00 for each additional plat sheet (in other words: $20 per plat sheet plus a flat $4.00 handling fee), along with flat $30.00 fee per document for Consent to Dedicate and CC&R (if applicable). The City pays to record the Assurance Agreement. If you are unsure of the fees, please call the County Recorder’s Office at 520-740-4350. Check must be pre-printed with name and address and dated within 45 days of the scheduled Mayor & Council meeting.

5. Original set of executed and notarized CC&R (if applicable).

6. Original set of executed and notarized Assurance Agreement (if applicable). For Third Party Land Trust, provide original Agreement to Construct, original Amendment to Trust, and copy of Trust Agreement.

7. Property owner(s) and consultant mailing addresses to receive notification from the City Clerk’s Office one (1) week prior to and following Mayor & Council meeting.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor & Council meeting. The City Development Review Committee ensures the Assurance Agreement is reviewed by the City Attorney’s Office prior to the Mayor & Council meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City Clerk’s Office keeps the recorded Final Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.

Should you have any questions, please contact Alexandra Hines at 520-837-6975 or alexandra.hines@tucsonaz.gov.

xc: Project Record by Activity Number

Final Status

Task End Date Reviewer's Name Type of Review Description
05/27/2020 AHINES2 OUT TO CUSTOMER Completed