Plan Number: S19-081
Parcel: Unknown

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S19-081
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/06/2020 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change S19-081

1) Please add note 2-07.5.2.E found in City of Tucson (COT) Administrative Manual (AM) and reference to corresponding lots
2) Map Tucson shows a constructed water course called "parking lot" running south-north on the western side of the property. Clarify if this is a regulatory watercourse of 100cfs or greater. If so show the 100 year floodplain boundary on the building
3) Sheet 1. General note 2. Update to say "THE TOTAL NUMBER OF LOTS IS 10"
4) Title block on both sheets, change "BLOCK PLAT FOR" to "FINAL PLAT FOR"

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
01/09/2020 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
01/10/2020 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
NOTE: A resubmittal with a Comment Response Letter is required.

Description: BLOCK PLAT - Campbell Plaza, Lots 1-10.
Permit/Activity Number: S19-081
Please include this number on all future correspondence.

Fees Due: $ 4,160.70
Note: A payment is required before we can accept your next submittal.
Please pay the total fees (or Review Fees at a minimum):
1. Online Payment (Not available for "DS.." permit numbers)
2. In person at the City Permit Counter (Mon-Fri, 8:00 AM to 2:00 PM)
3. By mail - a check payable to the City of Tucson (address is below), include the Activity Number

Online Payment
https://www.tucsonaz.gov/pdsd/online-resources-fees-maps-records
1. NOTE: It may take 1-2 days for complete permit information to be available online
2. Visa, MC, Discover, American Express
3. Not case-sensitive but a hyphen is needed, for example: dp19-2000
4. Enter your Permit Nbr. and click the Continue tab
5. Business/Individual Name: Leave blank
6. If any issues, try using the browser Internet Explorer

View documents and reviewer's comments on PRO: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Documents section, click on blue icon to the right of each document
- Reviews section, click on Review Details

YOUR NEXT STEPS: Submit the following items to the Filedrop - https://www.tucsonaz.gov/file-upload-pdsd
- In the Project Description field, enter the Activity Number
- Name your 2nd submittal documents accordingly, for example: 2_Plan_Set
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, 2nd Floor
Tucson, AZ 85701
email: COTDSDPermits@TucsonAz.gov
11/29/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
11/29/2019 SBEASLE1 START PLANS SUBMITTED Completed
11/29/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change The Applicant is responsible for obtaining a Water Availability Letter from Tucson Water (or Ray Water Company, if applicable). Provide the Letter in your next submittal. Mayor & Council cannot approve until water is assured.
11/29/2019 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change The Applicant is responsible for obtaining review and approval for wastewater from Pima County (email: Sewer@Pima.gov) prior to Mayor & Council approval of the final plat. Please provide an approval document in the next resubmittal.
11/29/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed Review not required. This agency was notified for their information only.
11/29/2019 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Review not required. This agency was notified for their information only.
12/02/2019 ED ABRIGO PIMA COUNTY ASSESSOR Approved FROM: Suzanne Gilpin, GIS Cartographer
Pima County Assessor's Office
(520)724-4387
DATE: December 2, 2019
RE: Assessor's Review and Comments Regarding Final Plat- S19-081 CAMPBELL PLAZA 1ST SUBMITTAL

X Plat meets Assessor's Office requirements.
12/16/2019 JIM EGAN COT NON-DSD FIRE Approved
12/16/2019 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this block plat.
Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation, (520) 837-8040
Howard.Dutt@tucsonaz.gov
12/17/2019 DAVID RIVERA ZONING HC REVIEW Approved
12/17/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Campbell Plaza Lots 1 -10
Final Plat (1st Review)
S19-081

TRANSMITTAL DATE: December 17, 2019

DUE DATE: December 30, 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.

2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:


2-07.5.1.A.3 Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and,

1. COMMENT: 2-07.5.1.A.3 Label the subdivisions within the one square mile location map.

Label the two following street names Mountain Avenue and Tucson Boulevard on the location map.




2-07.5.1.F Orient the subdivision drawing with north toward the top of the page, when possible. Place a north arrow on each sheet in the upper right corner with the scale of the drawing beneath the arrow. All lettering, dimensions, etc., must be oriented to the north. If it is not practical to orient north to the top of the sheet, the plan drawing shall be oriented with north to the left side of the sheet.

2. COMMENT: 2-07.5.1.F - The drawing shall be oriented with north to the left side of the sheet. Correct as required.


2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

3. COMMENT: 2-07.5.1.H - List the assigned subdivision case number S19-081 next to the title block of both sheets.


2-07.5.2 General Notes
The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information.


2-07.5.2.J If applicable, add the following note: "This subdivision is subject to Ordinance No. ____ ,Which established zoning in the _____________________ Annexation Area."

4. COMMENT: 2-07.5.2.J Add as a general note the statement noted above and fill in the blanks with the following (respectively); 1895 and North To Roger Rd. And East To Kolb Rd.


2-07.5.4 Proposed Subdivision Information
Provide the following information on the plat:


2-07.5.4.H. Show no-vehicular access easements where applicable;

5. COMMENT: 2-07.5.4.H - Clarify if there will be a cross access, parking etc agreement recorded along with the final plat?


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
12/23/2019 KAY MARKS PIMA COUNTY ADDRESSING Approved S19-081 Block plat for Campbell Plaza Lots 1-10 is Approved by Pima County Addressing.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor Tucson, AZ 85701, (520) 724-7570
12/26/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
12/30/2019 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on November 29, 2019. If new TEP easements are required for future development, they will be obtained by separate instrument.
If there are any questions, please feel free to contact me at 520-917-8744.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co., Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
12/31/2019 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Completed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/10/2020 SBEASLE1 OUT TO CUSTOMER Completed