Plan Number: S19-075
Parcel: Unknown

Address:
1450 N BROWN AV

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S19-075
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/09/2020 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
11/27/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Reqs Change The Applicant is responsible for obtaining a Water Availability Letter from Tucson Water (or Ray Water Company, if applicable). Provide the Letter in your next submittal. Mayor & Council cannot approve until water is assured.
11/27/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed Review not required. This agency was notified for their information only.
11/27/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
11/27/2019 SBEASLE1 START PLANS SUBMITTED Completed
11/27/2019 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Review not required. This agency was notified for their information only.
11/29/2019 ED ABRIGO PIMA COUNTY ASSESSOR Approved FROM: Suzanne Gilpin, GIS Cartographer
Pima County Assessor's Office,(520)724-4387
DATE: November 27, 2019
RE: Assessor's Review and Comments Regarding Final Plat- S19-075-1450 NORTH BROWN AVENUE LOTS 1 & 2/1ST SUBMITTAL

X Plat meets Assessor's Office requirements.
12/11/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: 1450 North Brown Avenue Lots 1 & 2
Final Plat (1st Review) - 1450 N. Brown Avenue
S19-075 - RX-1 Zoning

TRANSMITTAL DATE: December 10, 2019

DUE DATE: December 26, 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.


2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:


2-07.5.1.A.2 Label the section, township, and range; section corners; north arrow; and the scale;

1. COMMENT: 2-07.5.1.A.2 - Label the section corners for the SE corner on the location map. Correct the section number labeled as 4 to 2 on the location map.


2-07.5.2 General Notes
The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information.

2-07.5.2.A "The gross area of this subdivision is ____ acres."

2. COMMENT: 2-07.5.2.A Revise general note 1 to state "Subdivision" instead of development.


2-07.5.2.J If applicable, add the following note: "This subdivision is subject to Ordinance No. ____ which established zoning in the _____________________ Annexation Area."

3. COMMENT: 2-07.5.2.J - Add as a general note the above statement and include the following in the blanks, the ordinance number "5962" and "Tanque Verde - Wrightstown" for Annexation area.


2-07.5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.


2-07.5.3.D Approval and Recording Data Blocks
The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows.

APPROVAL

"I, (fill in name of current City Clerk), Clerk of the City of Tucson, Arizona, hereby certify that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this ____ day of __________, 20__."

____________________________________________ ______________
Clerk, City of Tucson Date

Sequence________________
Fee_____________________
State of Arizona
County of Pima
I hereby certify that the instrument
was filed for record at the request
Of__________________________
Date________________________
Time_________________________
Witness my hand and Official Seal
day and year above written.
F. ANN RODRIGUEZ, County Recorder
BY___________________________
Deputy


COMMENT: 2-07.5.3.D - Relocate the recording text block under the Approval Text block.

I am not sure that this final plat will be ready or sent to M & C for approval before the end of the 2019 year. It is suggested that the 2019 be revised to 2020 or to 20 with and under line.


2-07.5.4 Proposed Subdivision Information
Provide the following information on the plat:


2-07.5.4.H. Show no-vehicular access easements where applicable;

5. COMMENT: 2-07.5.4.H - If applicable indicate if there will be a 1-foot no access easement.


The following comments are related to the supplemental site plan.

6. COMMENT: Lot 1; all the accessory structures on Lot 1 must be removed prior to approval of the final plat. The supplemental site plan was reviewed as reference only. A separate plot plan, building plans and permit application is required for the proposed dwelling. A separate compliance review will be made at time of permit application for lot 1.

Lot 2; The large Ramada structure that is crossing over the new property line must be relocated or removed to meet the 20 foot setback.

The two smaller sheds within the 20 building setback adjacent to the new lot line must be relocated to meet the 20 foot setback. The option, to request the adjacent owner setback waiver, sees the statement below.

The adjacent owner's waiver statement must be added to the site plan. The following statement can be used.

"My Name is __________________ and I am the owner of the property located at ________________________.
I have reviewed the site plan and I have no objection to structure being located or constructed ______ feet from the property line as depicted on the supplemental site plan."



If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
12/11/2019 DAVID RIVERA ZONING HC REVIEW Approved
12/11/2019 JIM EGAN COT NON-DSD FIRE Approved
12/16/2019 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this block plat.
Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation,(520) 837-8040
Howard.Dutt@tucsonaz.gov
12/20/2019 KAY MARKS PIMA COUNTY ADDRESSING Approved S19-075, Shepherd block plat, 1450 N Brown Av Lots 1 & 2, is Approved by Pima County Addressing.
Upon recordation of the Final Plat, Lot 1 will be issued the address 1480 N Brown Av and Lot 2 will retain the existing address 1450 N Brown Av.
Please let me know if you have any questions. Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor Tucson, AZ 85701
(520) 724-7570
12/24/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
12/30/2019 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Completed
12/30/2019 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on November 27, 2019.
Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument.
Please contact me at 520-917-8744 should you have any questions.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co., Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
12/30/2019 SBEASLE1 PIMA COUNTY WASTEWATER Reqs Change The Applicant is responsible for obtaining review and approval for wastewater from Pima County (email: Sewer@Pima.gov) prior to Mayor & Council approval of the final plat. Please provide an approval document in the next resubmittal.
12/30/2019 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change S19-075

1) Please place use the APPROVAL block alignment found in Administrative Manual section 2-07.5.3.D

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
12/31/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
NOTE: A resubmittal with a Comment Response Letter is required.

Permit/Activity Number: S19-075
Include this number on all future correspondence.

Project Description: BLOCK PLAT - Shepherd Block Plat, Lots 1 and 2.

Fees Due: $ 1,116.50
Note: A payment is required before we can accept your next submittal.
Please pay the total fees (or Review Fees at a minimum):
1. Online Payment (Not available for "DS.." permit numbers)
2. In person at the City Permit Counter (Mon-Fri, 8:00 AM to 2:00 PM)
3. By mail - a check payable to the City of Tucson (address is below), include the Activity Number

Online Payment
https://www.tucsonaz.gov/pdsd/online-resources-fees-maps-records
1. NOTE: It may take 1-2 days for permit information to be available online
2. Visa, MC, Discover, American Express
3. Not case-sensitive but a hyphen is needed, for example: dp19-2000
4. Enter your Permit Nbr. and click the Continue tab
5. Business/Individual Name: Leave blank
6. If any issues, try using the browser Internet Explorer

View the documents and the reviewer's comments online: www.tucsonaz.gov/pro
(If information is not available, check back later after data transfers to PRO.)
- Home page, left side, Activity Search, enter the Activity Number
- Permits section, click on blue tab
- Documents section, click on blue icon to the right of each document
- Reviews section, click on "Review Details"

Submit the following items to the Filedrop.
In the Project Description field, enter the Activity Number.
PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's Requires Change comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
4) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

NOTE: All City of Tucson offices will be closed on Wednesday, January 1 (except for emergency services). Planning & Development Services will be open normal business hours on Thursday and Friday: https://www.tucsonaz.gov/pdsd/contact-us-hours-service.

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, 2nd Floor
Tucson, AZ 85701
email: COTDSDPermits@TucsonAz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
12/31/2019 SBEASLE1 OUT TO CUSTOMER Completed