Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S19-064
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/29/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
08/29/2019 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | Review not required. This agency was notified for their information only. |
09/03/2019 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | FROM: Julieann Arechederra, GIS Cartographer Pima County Assessor's Office DATE: September 3, 2019 RE: Assessor's Review and Comments Regarding: BRIDGES THE, B-3 S19-064 FINAL PLAT X Plat meets Assessor's Office requirements. |
09/12/2019 | PAUL CAMARENA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Final Plat for the bridges sub-area B-III lots 1 through 9 and common area "A Final Plat (1st Review) 3434 S KINO PW S19-064 - PAD 15 Zoning TRANSMITTAL DATE: September 12, 2019 DUE DATE: September 27, 2019 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. . 2-07.5.0 CONTENT REQUIREMENTS 5.1 General 2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 1. COMMENT: Provide the subdivision case number, S19-064 in the right hand corner of the plat next to the title block and also provide the DP case number assigned to the approved tentative plat as noted by the standard above. 2-07.5.2.B "The total number of lots is ____." 2. COMMENT: Revise note to state " The total number of lots is 9 with one common area "A"" 2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; If you have any questions about this transmittal, Contact Paul Camarena at (520) 791-5550 or by email Paul.Camarena@tucsonaz.gov or contact Steve Shields at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
09/20/2019 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Reqs Change | (ADDRESSING review document with comments can be viewed on PRO in the "Documents" section) S19-064 Final plat for the Bridges, Sub-area B-3, Block 4 Lots 1-9 is being Returned for Corrections by Pima County Addressing. Please let me know if you have any questions. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor Tucson, AZ 85701 (520) 724-7570 CC: Lisa Bowers/MetroTed |
09/25/2019 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the final plat for Bridges Sub-Area B-III Block 4, submitted on August 29, 2019. Please call the New Construction Department at 520-918-8300 to apply for service for new development. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument. Please contact me at 520-917-8744 should you have any questions. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co., Land Resources – RC 131 3950 E. Irvington Road, Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com |
09/30/2019 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Approved | 08/29/2019 P19WS00041 Sewer Layout Approval Site The Bridges Sub-Area B-III, Lots 1-9 Final Plat Approved |
10/15/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
10/18/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE - A resubmittal is required Permit/Activity Number: S19-064 Project Description: FINAL PLAT - Bridges, Sub-area, B-3, Block 4, Lots 1-9 and common area "A" (private street and utilities). Project Manager: Nicholas.Ross@TucsonAz.gov, (520) 837-4029 The fee balance is $0 (zero). Thank you for the payment. To view the review comments: www.tucsonaz.gov/PRO, enter the Permit/Activity Number. (If information isn't shown yet, check back later as data uploads to PRO periodically.) Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (your response to the reviewer's “Requires changes” comments) 2) Plan Set (all pages, full set) 3) Any other documents requested by review staff 4) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set Thank you. Sharon Beasley, Permit Specialist City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
10/21/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | See approval letter in PRO, Documents section. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
10/18/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |