Plan Number: S19-061
Parcel: Unknown

Address:
915 S 2ND AV

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S19-061
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/23/2019 SBEASLE1 START PLANS SUBMITTED Completed
08/23/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
08/23/2019 SBEASLE1 PIMA COUNTY WASTEWATER Passed The Applicant is responsible for obtaining review and approval by Pima County Wastewater if applicable. Email: Sewer@Pima.gov.
08/23/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed Review not required - project involves less than six total lots.
08/23/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed Review not required. This agency was notified for their information only.
08/23/2019 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change FROM: Suzanne Gilpin, GIS Cartographer
Pima County Assessor's Office, (520)724-4387
DATE: August 23, 2019
RE: Assessor's Review and Comments Regarding Final Plat-
S19-061/915 S 2ND AVENUE-1ST SUBMITTAL

__X___ Plat does not meet Assessor's Office requirements.

COMMENTS:
1. The title block in the lower right hand corner you state that the portion of map & plat to be Book 03, page 070, should read: Book 02, page 003 map & plat.
2. Dedication signature line should read: Steven J. Multin, Trustee.
08/23/2019 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Review not required. This agency was notified for their information only.
08/27/2019 JIM EGAN COT NON-DSD FIRE Completed
09/10/2019 DAVID RIVERA ZONING HC REVIEW Approved
09/10/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Minor Subdivision for 915 S. 2nd Avenue - 2 Lots
Final Plat (1st Review)
S19-061 - R-3 Zoning

TRANSMITTAL DATE: September 10, 2019

DUE DATE: September 23, 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

1. COMMENT: List the Subdivision case number S19-061 next to the title block.


2. COMMENT: Include a copy of the setback waiver with the next submittal.






If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
09/12/2019 KAY MARKS PIMA COUNTY ADDRESSING Reqs Change (The "attached PDF" mentioned here can be viewed on PRO in the "Documents" section)

S19-061 / 915 S. 2nd Ave./ 1st submittal is Conditionally Approved by Pima County Addressing subject to verification of the plat reference of the original Lots 3 and 6 in block 148. Pima County Assessor legal description references MP 02004.

The attached pdf contains the Addressing for the two lots.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701
(520) 724-7570
09/18/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the final plat for a minor subdivision submitted on August 23, 2019. If TEP easements are required to serve new development on the site, they will be obtained by separate instrument.
If there are any questions, please contact me at 520-917-8744.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
09/18/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
09/19/2019 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this Minor Subdivision.
Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation, (520) 837-8040
Howard.Dutt@tucsonaz.gov
09/23/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
09/23/2019 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Reqs Change For the purposes of having a water meter, a parcel is required to have a minimum width of 15-feet of frontage on a water main. An easement is not considered to be frontage. Reference: Tucson Water Remote Meter Policy, Number IV-B.08, dated 07/14/2009.
10/03/2019 LOREN MAKUS ENGINEERING REVIEW Approved
10/07/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
- A resubmittal is required
Permit/Activity Number: S19-061
Project Description: MINOR SUBD - 915 S. 2nd Avenue.
The fee balance is $0 (zero). Thank you for your payment.
To view the review comments: www.tucsonaz.gov/PRO, enter Activity Number.
(If information isn't shown yet, check back later as data uploads to PRO periodically.)
Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (listing your response to the reviewer's comments and the changes that were made)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
4) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
10/07/2019 SBEASLE1 OUT TO CUSTOMER Completed